Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17635
Well Classification: GW Status: PR - 6/30/2010
Well Name/No:FEDERAL #RWF 621-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date6/30/2010
FacilityID:299271LocationID:335448
County:GARFIELD #045Location:SESW 18 6S94W 6
Field:RULISON - #75400Elevation:5972 ft.
Basin:PICEANCE BASIN  
Planned Location:219FSL  1656 FWLLat/Long: 39.518233 / -107.932361Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.518229 / -107.932359Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/30/2010             Measured TD: 8756 ft.    Vertical TD: 8668 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/30/2010
Wellbore PermitDIRECTIONAL
Permit #:20091251 Expiration Date:5/12/2010
Proposed Top PZ Location:Sec: Twp: Footage: 152 FNL  2002 FWL
Bottom Hole Location:Sec:19 Twp: 6S 94W Footage: 152 FNL  2002 FWL
Proposed Depth/Form:8697 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:2/1/2010
Spud Date:1/21/2010Spud Date Is:ACTUAL
Measured TD:8756 ft.Measured PB depth:8697 ft.
True Vertical TD:8668 ft.True Vertical PB depth:8609 ft.
Top PZ Location:Sec:19 Twp: 6S 94WFootage: 116 FNL  2163 FEL
Bottom Hole Location:Sec:19 Twp: 6S 94WFootage: 142 FNL  2172 FEL
Log Types:CBL, HIGH RESOLUTION INDUCTION, SPECIAL DENSITY, DUAL SPACED NEUTRON, MUD
Log Types:SP/GR/HDIL/ZDL/CN AND CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 65 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 65 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1142 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1142 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8739 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1025, Top: 4100 ft., Bottom: 8739 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2736 ft.
MESAVERDE5129 ft.
CAMEO7726 ft.
ROLLINS8651 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/30/2010                 Interval Top: 6495 ft.    Interval Bottom: 8571 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/17/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/11/2010
Treatment Summary:4858 GALS 7 1/2% HCL; 1050936 # 20/40 SAND; 24041 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8163 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1048
CASING_PRESS 1269
MCF_GAS 1024
TUBING_PRESS 963
Perforation Data:
Interval Top:6495 ft.# Of Holes:186
Interval Bottom:8571 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)49
Total Gas Produced (MCF)31728
GOR647510
GOR DeterminationMCFE
Average BOE per Day15.128
Average MCFE per Day87.757

 Federal Financial Assurance  i Y

 Tribal Well  i No