Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17631
Well Classification: GW Status: PR - 6/30/2010
Well Name/No:FEDERAL #RWF 21-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date6/30/2010
FacilityID:299267LocationID:335448
County:GARFIELD #045Location:SESW 18 6S94W 6
Field:RULISON - #75400Elevation:5972 ft.
Basin:PICEANCE BASIN  
Planned Location:202FSL  1598 FWLLat/Long: 39.518188 / -107.932566Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.518185 / -107.932565Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/30/2010             Measured TD: 8668 ft.    Vertical TD: 8653 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/30/2010
Wellbore PermitDIRECTIONAL
Permit #:20091247 Expiration Date:5/12/2010
Proposed Top PZ Location:Sec: Twp: Footage: 373 FNL  1627 FWL
Bottom Hole Location:Sec:19 Twp: 6S 94W Footage: 373 FNL  1627 FWL
Proposed Depth/Form:8694 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:10/23/2009
Spud Date:10/9/2009Spud Date Is:ACTUAL
Measured TD:8668 ft.Measured PB depth:8614 ft.
True Vertical TD:8653 ft.True Vertical PB depth:8599 ft.
Top PZ Location:Sec:19 Twp: 6S 94WFootage: 205 FNL  1591 FWL
Bottom Hole Location:Sec:19 Twp: 6S 94WFootage: 206 FNL  1591 FWL
Log Types:CBL, RPM
Log Types:CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 65 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 65 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1145 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1145 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8648 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 978, Top: 3960 ft., Bottom: 8648 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2668 ft.
WASATCH G2668 ft.NN
MESAVERDE5056 ft.
CAMEO7668 ft.
ROLLINS8586 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/30/2010                 Interval Top: 6497 ft.    Interval Bottom: 8503 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/20/2009Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/18/2009
Treatment Summary:4437 GALS 7 1/2% HCL; 798800 # 20/40 SAND; 23230 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8114 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1105
CASING_PRESS 388
MCF_GAS 778
TUBING_PRESS 258
Perforation Data:
Interval Top:6497 ft.# Of Holes:153
Interval Bottom:8503 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)17213
GOR614750
GOR DeterminationMCFE
Average BOE per Day8.216
Average MCFE per Day47.636

 Federal Financial Assurance  i Y

 Tribal Well  i No