Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17630
Well Classification: GW Status: PR - 6/30/2010
Well Name/No:FEDERAL #RWF 324-18
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date6/30/2010
FacilityID:299266LocationID:335448
County:GARFIELD #045Location:SESW 18 6S94W 6
Field:RULISON - #75400Elevation:5972 ft.
Basin:PICEANCE BASIN  
Planned Location:230FSL  1660 FWLLat/Long: 39.518265 / -107.932346Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.518261 / -107.932343Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/30/2010             Measured TD: 8684 ft.    Vertical TD: 8655 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/30/2010
Wellbore PermitDIRECTIONAL
Permit #:20091255 Expiration Date:5/12/2010
Proposed Top PZ Location:Sec: Twp: Footage: 850 FSL  1879 FWL
Bottom Hole Location:Sec:18 Twp: 6S 94W Footage: 850 FSL  1879 FWL
Proposed Depth/Form:8726 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:2/12/2010
Spud Date:2/2/2010Spud Date Is:ACTUAL
Measured TD:8684 ft.Measured PB depth:8629 ft.
True Vertical TD:8655 ft.True Vertical PB depth:8600 ft.
Top PZ Location:Sec:18 Twp: 6S 94WFootage: 761 FSL  1881 FWL
Bottom Hole Location:Sec:18 Twp: 6S 94WFootage: 756 FSL  1870 FWL
Log Types:CBL AND RPM
Log Types:CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 65 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 65 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1148 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1148 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8669 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1060, Top: 5110 ft., Bottom: 8669 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2663 ft.
MESAVERDE5086 ft.
CAMEO7683 ft.
ROLLINS8565 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/30/2010                 Interval Top: 6346 ft.    Interval Bottom: 8458 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/20/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/11/2010
Treatment Summary:5001 GALS 7 1/2% HCL: 1166021# 20/40 SAND, 30221 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8119 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1084
CASING_PRESS 932
MCF_GAS 953
TUBING_PRESS 1288
Perforation Data:
Interval Top:6346 ft.# Of Holes:197
Interval Bottom:8458 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)53
Total Gas Produced (MCF)25318
GOR477698
GOR DeterminationMCFE
Average BOE per Day12.109
Average MCFE per Day70.229

 Federal Financial Assurance  i Y

 Tribal Well  i No