Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17629
Well Classification: GW Status: PR - 12/1/2014
Well Name/No:FEDERAL #RWF 514-18
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date12/1/2014
FacilityID:299265LocationID:335448
County:GARFIELD #045Location:SESW 18 6S94W 6
Field:RULISON - #75400Elevation:5972 ft.
Basin:PICEANCE BASIN  
Planned Location:218FSL  1617 FWLLat/Long: 39.518232 / -107.932499Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.518227 / -107.932498Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2014             Measured TD: 9130 ft.    Vertical TD: 8908 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2014
Wellbore PermitDIRECTIONAL
Permit #:20091248 Expiration Date:5/12/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1122 FSL  307 FWL
Bottom Hole Location:Sec:18 Twp: 6S 94W Footage: 1122 FSL  307 FWL
Proposed Depth/Form:9182 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:1/8/2010
Spud Date:12/27/2009Spud Date Is:ACTUAL
Measured TD:9130 ft.Measured PB depth:9061 ft.
True Vertical TD:8908 ft.True Vertical PB depth:8839 ft.
Top PZ Location:Sec:18 Twp: 6S 94WFootage: 1116 FSL  324 FWL
Bottom Hole Location:Sec:18 Twp: 6S 94WFootage: 1115 FSL  325 FWL
Log Types:CBL, RPM
Log Types:CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 65 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 65 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1137 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1137 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9117 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1010, Top: 4900 ft., Bottom: 9117 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2726 ft.NN
MESAVERDE5275 ft.
CAMEO7919 ft.
ROLLINS8861 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 12/1/2014                 Interval Top: 6714 ft.    Interval Bottom: 8767 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/25/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/20/2010
Treatment Summary:3774 GALS 7 1/2% HCL; 943877 # 20/40 SAND; 28212 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:8414 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1081
CASING_PRESS 1569
MCF_GAS 1079
TUBING_PRESS 1291
Perforation Data:
Interval Top:6714 ft.# Of Holes:150
Interval Bottom:8767 ft.Hole Size:0.35 in.

Formation MRRW6                   Formation Classification:  OW                   Status:  AB - 7/26/2011                 Interval Top: 6513 ft.    Interval Bottom: 6664 ft.

 Completed Information for Formation MORROW V-6
1st Production Date:1/25/2010Choke Size: 
Formation Name:MORROW V-6Commingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/20/2010
Treatment Summary:7/26/11: SWAB TESTED ENTIRE MV6 STAGE (17.5 BPH), MOVED PKR TO SWAB TEST BOTTOM SET OF PERFS IN M V6 (WOULD NOT FLOW GAS/WATER). SQUEEZED MV6 )6850' - 6760') W/100 SX 17 PPG CLASS G CEMENT, DRILLED OUT CEMENT AND PRESSURE TETED SQUEEZE HOLES TO 1000 PSI (TESTED W/ 265 JTS ON 7/26/2011, WELL HAS RETURN TO PRODUCTION.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation MRRW6.
Perforation Data:
Interval Top:6513 ft.# Of Holes:16
Interval Bottom:6664 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)74
Total Gas Produced (MCF)34978
GOR472675
GOR DeterminationMCFE
Average BOE per Day16.733
Average MCFE per Day97.047

 Federal Financial Assurance  i Y

 Tribal Well  i No