Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17542
Well Classification: GW Status: PR - 4/30/2009
Well Name/No:WILLIAMS #GM 342-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24099
Facility Status:PRStatus Date4/30/2009
FacilityID:299030LocationID:335241
County:GARFIELD #045Location:SWNE 32 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5606 ft.
Basin:PICEANCE BASIN  
Planned Location:1502FNL  1706 FELLat/Long: 39.483642 / -108.128847Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.483642 / -108.128849Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/30/2009             Measured TD: 6730 ft.    Vertical TD: 6597 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/30/2009
Wellbore PermitDIRECTIONAL
Permit #:20085491 Expiration Date:10/15/2009
Proposed Top PZ Location:Sec: Twp: Footage: 2393 FNL  1175 FEL
Bottom Hole Location:Sec:32 Twp: 6S 96W Footage: 2393 FNL  1175 FEL
Proposed Depth/Form:6681 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-17 , Unit Acreage: 160, Drill Unit: NE4

Wellbore Completed
Completion Date:1/15/2009
Spud Date:1/5/2009Spud Date Is:ACTUAL
Measured TD:6730 ft.Measured PB depth:6640 ft.
True Vertical TD:6597 ft.True Vertical PB depth:6508 ft.
Top PZ Location:Sec:32 Twp: 6S 96WFootage: 2386 FNL  1149 FEL
Bottom Hole Location:Sec:32 Twp: 6S 96WFootage: 2386 FNL  1149 FEL
Log Types:CBL; RMTE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 741 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 235, Top: 0 ft., Bottom: 741 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6677 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 745, Top: 2740 ft., Bottom: 6677 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1925 ft.NN
MESAVERDE3592 ft.NN
CAMEO6117 ft.NN
ROLLINS6568 ft.NN

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 7/1/2011                  Interval Top: 4946 ft.    Interval Bottom: 6508 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/5/2009Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/4/2009
Treatment Summary:3069 GALS 7.5% HCL; 675,000# 30/50 SAND; & 18,894 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6136 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2009Test Method:FLOWING
Hours Tested:21Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1061
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1076
CASING_PRESS 943
GRAVITY_OIL 0
MCF_GAS 1076
TUBING_PRESS 841
Perforation Data:
Interval Top:4946 ft.# Of Holes:115
Interval Bottom:6508 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)21
Total Gas Produced (MCF)16059
GOR764714
GOR DeterminationMCFE
Average BOE per Day7.642
Average MCFE per Day44.349

 Federal Financial Assurance  i Y

 Tribal Well  i No