Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17514
Well Classification: GW Status: PR - 10/15/2008
Well Name/No:PUCKETT #GM 512-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/15/2008
FacilityID:298981LocationID:335222
County:GARFIELD #045Location:SENE 31 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5938 ft.
Basin:PICEANCE BASIN  
Planned Location:1884FSL  497 FELLat/Long: 39.481586 / -108.143478Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.481582 / -108.143473Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/6/2008             Measured TD: 7096 ft.    Vertical TD: 6845 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/6/2008
Wellbore PermitDIRECTIONAL
Permit #:20085503 Expiration Date:10/14/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1374 FNL  708 FWL
Bottom Hole Location:Sec:32 Twp: 6S 96W Footage: 1374 FNL  708 FWL
Proposed Depth/Form:7091 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:5/27/2009
Spud Date:5/18/2009Spud Date Is:ACTUAL
Measured TD:7096 ft.Measured PB depth:7043 ft.
True Vertical TD:6845 ft.True Vertical PB depth:6792 ft.
Top PZ Location:Sec:32 Twp: 6S 96WFootage: 1364 FNL  708 FWL
Bottom Hole Location:Sec:32 Twp: 6S 96WFootage: 1364 FNL  708 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION; SPECTRAL DENSITY, DUAL SPACED NEUTRON, RPM, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 74 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 74 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 962 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 962 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7074 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 3150 ft., Bottom: 7074 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2257 ft.NN
FORT UNION2591 ft.NN
MESAVERDE3948 ft.NN
CAMEO6508 ft.NN
ROLLINS6965 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/31/2009                Interval Top: 5257 ft.    Interval Bottom: 6916 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/8/2009Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/6/2009
Treatment Summary:2997 GALS 7.5% HCL; 907342# 30/50 SAND; 23856 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6700 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/31/2009Test Method:FLOWING
Hours Tested:21Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1074
CASING_PRESS 952
MCF_GAS 971
TUBING_PRESS 739
Perforation Data:
Interval Top:5257 ft.# Of Holes:119
Interval Bottom:6916 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)7142
GOR595166
GOR DeterminationMCFE
Average BOE per Day3.401
Average MCFE per Day19.721

 Federal Financial Assurance  i 

 Tribal Well  i No