Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17468
Well Classification: GW Status: PR - 11/11/2013
Well Name/No:WILLIAMS #RWF 312-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/11/2013
FacilityID:298905LocationID:311599
County:GARFIELD #045Location:SENE 33 6S94W 6
Field:RULISON - #75400Elevation:5329 ft.
Basin:PICEANCE BASIN  
Planned Location:1454FNL  1069 FELLat/Long: 39.485052 / -107.887342Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.485051 / -107.887341Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/13/2013
End Date: 8/16/2013
Reported: 9/9/2013
Days to report: 24
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/11/2013             Measured TD: 7935 ft.    Vertical TD: 7598 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/11/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/27/2013
Proposed Top PZ Location:Sec:34 Twp: 6S 94W Footage: 2296 FNL  458 FWL
Bottom Hole Location:Sec:34 Twp: 6S 94W Footage: 2296 FNL  458 FWL
Proposed Depth/Form:7908 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: W/2W/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 75, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1801 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 464, Top: 0 ft., Bottom: 1801 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7908 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 685, Top: 3935 ft., Bottom: 7908 ft.

Wellbore Completed
Completion Date:7/18/2013
Spud Date:7/8/2013Spud Date Is:ACTUAL
Measured TD:7935 ft.Measured PB depth:7891 ft.
True Vertical TD:7598 ft.True Vertical PB depth:7554 ft.
Top PZ Location:Sec:34 Twp: 6S 94WFootage: 2294 FNL  451 FWL
Bottom Hole Location:Sec:34 Twp: 6S 94WFootage: 2294 FNL  435 FWL
Log Types:RPM/CBL/MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 66 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 66 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1870 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 1870 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7925 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1400, Top: 2755 ft., Bottom: 7925 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1562 ft.
MESAVERDE4158 ft.
CAMEO6852 ft.
ROLLINS7747 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 8/31/2013                 Interval Top: 5664 ft.    Interval Bottom: 7657 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/13/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/13/2013Treatment End Date:8/16/2013
Treatment Summary:1437 Gals 7 ½% HCL; 813000 # 40/70 Sand: 21704 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):21738Max pressure during treatment (psi):6461
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):34Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):21704Total flowback volume recovered (bbls):5692
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):813000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7441 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1060
CALC_MCF_GAS 677
CASING_PRESS 1839
MCF_GAS 677
TUBING_PRESS 1379
Perforation Data:
Interval Top:5664 ft.# Of Holes:134
Interval Bottom:7657 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)50
Total Gas Produced (MCF)28543
GOR570860
GOR DeterminationMCFE
Average BOE per Day13.623
Average MCFE per Day79.016

 Federal Financial Assurance  i 

 Tribal Well  i No