Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17302
Well Classification: GW Status: PR - 9/26/2008
Well Name/No:WILLIAMS #GM 341-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/26/2008
FacilityID:298625LocationID:335435
County:GARFIELD #045Location:NENE 33 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5402 ft.
Basin:PICEANCE BASIN  
Planned Location:1022FNL  446 FELLat/Long: 39.485108 / -108.105575Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.485108 / -108.105576Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/16/2008             Measured TD: 6650 ft.    Vertical TD: 6612 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/16/2008
Wellbore PermitDIRECTIONAL
Permit #:20084808 Expiration Date:9/25/2009
Proposed Top PZ Location:Sec: Twp: Footage: 607 FNL  666 FEL
Bottom Hole Location:Sec:33 Twp: 6S 96W Footage: 607 FNL  666 FEL
Proposed Depth/Form:6622 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 160, Drill Unit: NE/4

Wellbore Completed
Completion Date:1/28/2009
Spud Date:1/19/2009Spud Date Is:ACTUAL
Measured TD:6650 ft.Measured PB depth:6596 ft.
True Vertical TD:6612 ft.True Vertical PB depth:6558 ft.
Top PZ Location:Sec:33 Twp: 6S 96WFootage: 610 FNL  667 FEL
Bottom Hole Location:Sec:33 Twp: 6S 96WFootage: 610 FNL  667 FEL
Log Types:CBL; RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 683 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 683 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6625 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 947, Top: 2690 ft., Bottom: 6625 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1758 ft.NN
MESAVERDE3439 ft.NN
CAMEO6029 ft.NN
ROLLINS6542 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/30/2009                 Interval Top: 4836 ft.    Interval Bottom: 6459 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/21/2009Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/20/2009
Treatment Summary:3020 GALS 7.5% HCL; 830,400# 30/50 SAND; 22,012 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6242 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2009Test Method:FLOWING
Hours Tested:21Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1066
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 899
MCF_GAS 1073
TUBING_PRESS 753
Perforation Data:
Interval Top:4836 ft.# Of Holes:114
Interval Bottom:6459 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)16
Total Gas Produced (MCF)10532
GOR658250
GOR DeterminationMCFE
Average BOE per Day5.014
Average MCFE per Day29.117

 Federal Financial Assurance  i 

 Tribal Well  i No