Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17207
Well Classification: GW Status: PR - 9/22/2008
Well Name/No:WILLIAMS #GM 532-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/22/2008
FacilityID:298450LocationID:335435
County:GARFIELD #045Location:NENE 33 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5402 ft.
Basin:PICEANCE BASIN  
Planned Location:1041FNL  406 FELLat/Long: 39.485056 / -108.105431Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.485056 / -108.105431Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/16/2008             Measured TD: 7001 ft.    Vertical TD: 6514 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/16/2008
Wellbore PermitDIRECTIONAL
Permit #:20084807 Expiration Date:9/21/2009
Proposed Top PZ Location:Sec: Twp: Footage: 2366 FNL  1844 FEL
Bottom Hole Location:Sec:33 Twp: 6S 96W Footage: 2366 FNL  1844 FEL
Proposed Depth/Form:6964 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 160, Drill Unit: NE/4

Wellbore Completed
Completion Date:2/26/2009
Spud Date:2/19/2009Spud Date Is:ACTUAL
Measured TD:7001 ft.Measured PB depth:6946 ft.
True Vertical TD:6514 ft.True Vertical PB depth:6459 ft.
Top PZ Location:Sec:33 Twp: 6S 96WFootage: 2347 FNL  1831 FEL
Bottom Hole Location:Sec:33 Twp: 6S 96WFootage: 2347 FNL  1831 FEL
Log Types:CBL; RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1287 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1287 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6980 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 954, Top: 2948 ft., Bottom: 6980 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1896 ft.NN
MESAVERDE3859 ft.NN
CAMEO6359 ft.NN
ROLLINS6849 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/30/2009                 Interval Top: 5238 ft.    Interval Bottom: 6772 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/21/2009Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/20/2009
Treatment Summary:2542 GALS 7.5% HCL; 701,400# 30/50 SAND; 18,754 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6429 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2009Test Method:FLOWING
Hours Tested:21Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1047
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 481
MCF_GAS 977
TUBING_PRESS 305
Perforation Data:
Interval Top:5238 ft.# Of Holes:96
Interval Bottom:6772 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)22
Total Gas Produced (MCF)14953
GOR679681
GOR DeterminationMCFE
Average BOE per Day7.119
Average MCFE per Day41.301

 Federal Financial Assurance  i 

 Tribal Well  i No