Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17204
Well Classification: GW Status: PR - 5/31/2009
Well Name/No:WILLIAMS #GM 432-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/31/2009
FacilityID:298447LocationID:335435
County:GARFIELD #045Location:NENE 33 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5402 ft.
Basin:PICEANCE BASIN  
Planned Location:1034FNL  419 FELLat/Long: 39.485072 / -108.105478Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.485072 / -108.105478Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/31/2009             Measured TD: 6770 ft.    Vertical TD: 6507 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/31/2009
Wellbore PermitDIRECTIONAL
Permit #:20084805 Expiration Date:9/21/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1690 FNL  1719 FEL
Bottom Hole Location:Sec:33 Twp: 6S 96W Footage: 1690 FNL  1719 FEL
Proposed Depth/Form:6760 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 160, Drill Unit: NE/4

Wellbore Completed
Completion Date:2/18/2009
Spud Date:2/12/2009Spud Date Is:ACTUAL
Measured TD:6770 ft.Measured PB depth:6723 ft.
True Vertical TD:6507 ft.True Vertical PB depth:
Top PZ Location:Sec:33 Twp: 6S 96WFootage: 1665 FNL  1694 FEL
Bottom Hole Location:Sec:33 Twp: 6S 96WFootage: 1665 FNL  1694 FEL
Log Types:CBL; RMTE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 70 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 70 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1009 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 295, Top: 0 ft., Bottom: 1009 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6757 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 923, Top: 2790 ft., Bottom: 6757 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1837 ft.NN
MESAVERDE3681 ft.NN
CAMEO6171 ft.NN
ROLLINS6651 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/31/2009                 Interval Top: 5047 ft.    Interval Bottom: 6538 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/21/2009Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/20/2009
Treatment Summary:2517 GALS 7.5% HCL; 673,800# 30/50 SAND; 18,008 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6234 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/31/2009Test Method:FLOWING
Hours Tested:21Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1060
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 846
CASING_PRESS 574
MCF_GAS 741
TUBING_PRESS 265
Perforation Data:
Interval Top:5047 ft.# Of Holes:91
Interval Bottom:6538 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)14
Total Gas Produced (MCF)10114
GOR722428
GOR DeterminationMCFE
Average BOE per Day4.817
Average MCFE per Day27.944

 Federal Financial Assurance  i 

 Tribal Well  i No