|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/1/2023 Measured TD: 10020 ft. Vertical TD: 9831 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/1/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20083608 | Expiration Date: | 9/14/2009 | | Proposed Top PZ Location: | Sec:34 Twp: 7S 95W | Footage: 533 FNL 1952 FEL | | Bottom Hole Location: | Sec:34 Twp: 7S 95W | Footage: 533 FNL 1952 FEL | | Proposed Depth/Form: | 10072 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-53 , Unit Acreage: 640, Drill Unit: ALL |
| | |
| Wellbore Completed | | Completion Date: | 6/6/2009 | | Spud Date: | 5/23/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 10020 ft. | Measured PB depth: | 9918 ft. | | True Vertical TD: | 9831 ft. | True Vertical PB depth: | 9729 ft. | | Top PZ Location: | Sec:34 Twp: 7S 95W | Footage: 533 FNL 1952 FEL | | Bottom Hole Location: | Sec:34 Twp: 7S 95W | Footage: 533 FNL 1952 FEL | | Log Types: | CBL, RMT, TRIPLE COMBO | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 170 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 0 ft., Bottom: 170 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3053 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1011, Top: 0 ft., Bottom: 3053 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10010 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1186, Top: 4110 ft., Bottom: 10010 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 6305 ft. | | N | N | | CAMEO | 8662 ft. | | N | N | | ROLLINS | 9183 ft. | | N | N | | COZZETTE | 9488 ft. | | N | N | | CORCORAN | 9722 ft. | | N | N | | MANCOS | 9851 ft. | | N | N |
Formation CMEO Formation Classification: GW Status: CM - 7/29/2013 Interval Top: 8722 ft. Interval Bottom: 9081 ft.| Completed Information for Formation CAMEO | | 1st Production Date: | 7/17/2012 | Choke Size: | | | Formation Name: | CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/6/2012 | Treatment End Date: | 7/6/2012 | | Treatment Summary: | Frac 750 gal of 7.5% HCL, 84,437 gal of 2%KCL, 89,000 lbs White Sand, and 24,700 lbs of Prime Plus | | Total fluid used in treatment (bbls): | 2099 | Max pressure during treatment (psi): | 7116 | | Total gas used in treatment (mcf): | 80 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | CARBON DIOXIDE | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 18 | Min frac gradient (psi/ft): | 30.50 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 113700 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CMEO. |
| | Perforation Data: | | Interval Top: | 8722 ft. | # Of Holes: | 40 | | Interval Bottom: | 9081 ft. | Hole Size: | 0.34 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 12/1/2023 Interval Top: 7504 ft. Interval Bottom: 9081 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 7/17/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8933 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/19/2013 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 340 | | BTU_GAS | 944 | | CALC_BBLS_H2O | 340 | | CALC_MCF_GAS | 1403 | | CASING_PRESS | 130 | | MCF_GAS | 1403 | | TUBING_PRESS | 1180 |
| | Perforation Data: | | Interval Top: | 7504 ft. | # Of Holes: | 171 | | Interval Bottom: | 9081 ft. | Hole Size: | 0.34 in. |
|
Formation WMFK Formation Classification: GW Status: CM - 7/29/2013 Interval Top: 7504 ft. Interval Bottom: 7614 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 7/17/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/8/2012 | Treatment End Date: | 7/18/2013 | | Treatment Summary: | Frac 4500 gal of 7.5% HCL, 84,437 gal of 2%KCL, 602,799 lbs White Sand, and 132,800 lbs of Prime Plus | | Total fluid used in treatment (bbls): | 14075 | Max pressure during treatment (psi): | 9196 | | Total gas used in treatment (mcf): | 53 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | CARBON DIOXIDE | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 102 | Min frac gradient (psi/ft): | 0.50 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 418 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 7355999 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/6/2012 | Treatment End Date: | 7/8/2012 | | Treatment Summary: | Frac 3,750 gal of 7.5% HCL, 1,836,450 gal of 2% KCL, 524,800 lbs of White Sand, and 113,700 lbs of Prime Plus
| | Total fluid used in treatment (bbls): | 45679 | Max pressure during treatment (psi): | 9196 | | Total gas used in treatment (mcf): | 12143 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | CARBON DIOXIDE | Number Of staged intervals: | 5 | | Total acid used in treatment (bbls): | 89 | Min frac gradient (psi/ft): | 0.59 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 638500 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WMFK. |
| | Perforation Data: | | Interval Top: | 7504 ft. | # Of Holes: | 131 | | Interval Bottom: | 7614 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 14 |
| Total Gas Produced (MCF) | 10764 |
| GOR | 768857 |
| GOR Determination | MCFE |
| Average BOE per Day | 5.118 |
| Average MCFE per Day | 29.686 |
| Federal Financial Assurance | i | |
|
|