Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17094
Well Classification: GW Status: PR - 9/5/2008
Well Name/No:WILLIAMS #GM14-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC23794
Facility Status:PRStatus Date9/5/2008
FacilityID:298164LocationID:335107
County:GARFIELD #045Location:NENW 32 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5686 ft.
Basin:PICEANCE BASIN  
Planned Location:824FNL  2635 FWLLat/Long: 39.485486 / -108.132411Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.485489 / -108.132409Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/30/2008             Measured TD: 7465 ft.    Vertical TD: 6667 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/30/2008
Wellbore PermitDIRECTIONAL
Permit #:20084401 Expiration Date:9/4/2009
Proposed Top PZ Location:Sec: Twp: Footage: 797 FSL  507 FWL
Bottom Hole Location:Sec:29 Twp: 6S 96W Footage: 797 FSL  507 FWL
Proposed Depth/Form:7458 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/16/2009
Spud Date:4/8/2009Spud Date Is:ACTUAL
Measured TD:7465 ft.Measured PB depth:7412 ft.
True Vertical TD:6667 ft.True Vertical PB depth:6614 ft.
Top PZ Location:Sec:29 Twp: 6S 96WFootage: 785 FSL  500 FWL
Bottom Hole Location:Sec:29 Twp: 6S 96WFootage: 785 FSL  500 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 65 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 65 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1463 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 0 ft., Bottom: 1463 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7445 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 757, Top: 3020 ft., Bottom: 7445 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2262 ft.NN
MESAVERDE4341 ft.NN
CAMEO6801 ft.NN
ROLLINS7353 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/30/2009                 Interval Top: 5643 ft.    Interval Bottom: 7276 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/12/2009Choke Size:0.156 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/11/2009
Treatment Summary:3000 GALS 7 1/2% HCL; 716900# 30/50 SAND; 19889 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7002 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/30/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1052
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 458
MCF_GAS 915
TUBING_PRESS 261
Perforation Data:
Interval Top:5643 ft.# Of Holes:103
Interval Bottom:7276 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)15234
GOR662347
GOR DeterminationMCFE
Average BOE per Day7.253
Average MCFE per Day42.099

 Federal Financial Assurance  i Y

 Tribal Well  i No