Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17089
Well Classification: GW Status: PR - 9/5/2008
Well Name/No:WILLIAMS #GM 322-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/5/2008
FacilityID:298159LocationID:335107
County:GARFIELD #045Location:NWNE 32 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5686 ft.
Basin:PICEANCE BASIN  
Planned Location:832FNL  2621 FELLat/Long: 39.485464 / -108.132172Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.485466 / -108.132171Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/30/2008             Measured TD: 6741 ft.    Vertical TD: 6607 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/30/2008
Wellbore PermitDIRECTIONAL
Permit #:20084442 Expiration Date:9/4/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1357 FNL  1828 FWL
Bottom Hole Location:Sec:32 Twp: 6S 96W Footage: 1357 FNL  1828 FWL
Proposed Depth/Form:6745 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-11 , Unit Acreage: 320, Drill Unit: W2 32

Wellbore Completed
Completion Date:3/21/2009
Spud Date:12/23/2008Spud Date Is:ACTUAL
Measured TD:6741 ft.Measured PB depth:6653 ft.
True Vertical TD:6607 ft.True Vertical PB depth:5979 ft.
Top PZ Location:Sec:32 Twp: 6S 96WFootage: 1366 FNL  1818 FWL
Bottom Hole Location:Sec:32 Twp: 6S 96WFootage: 1366 FNL  1818 FWL
Log Types:CBL; RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1230 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1230 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6727 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 742, Top: 3145 ft., Bottom: 6727 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2012 ft.NN
MESAVERDE3631 ft.NN
CAMEO6144 ft.NN
ROLLINS6632 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/7/2009                  Interval Top: 4948 ft.    Interval Bottom: 6555 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/21/2009Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/19/2009
Treatment Summary:2978 GALS 7.5% HCL; 768,200# 30/50 SAND; 20,738 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6272 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/7/2009Test Method:FLOWING
Hours Tested:21Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1065
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 538
MCF_GAS 922
TUBING_PRESS 339
Perforation Data:
Interval Top:4948 ft.# Of Holes:122
Interval Bottom:6555 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)26
Total Gas Produced (MCF)17438
GOR670692
GOR DeterminationMCFE
Average BOE per Day8.328
Average MCFE per Day48.328

 Federal Financial Assurance  i 

 Tribal Well  i No