Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17088
Well Classification: GW Status: PR - 6/30/2009
Well Name/No:WILLIAMS #GM 513-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC23794
Facility Status:PRStatus Date6/30/2009
FacilityID:298158LocationID:335107
County:GARFIELD #045Location:NWNE 32 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5686 ft.
Basin:PICEANCE BASIN  
Planned Location:823FNL  2659 FELLat/Long: 39.485489 / -108.132206Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.485491 / -108.132302Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/30/2009             Measured TD: 7675 ft.    Vertical TD: 6785 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/30/2009
Wellbore PermitDIRECTIONAL
Permit #:20084399 Expiration Date:9/4/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1573 FSL  1096 FWL
Bottom Hole Location:Sec:29 Twp: 6S 96W Footage: 1573 FSL  1096 FWL
Proposed Depth/Form:7611 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/24/2009
Spud Date:3/16/2009Spud Date Is:ACTUAL
Measured TD:7675 ft.Measured PB depth:7612 ft.
True Vertical TD:6785 ft.True Vertical PB depth:
Top PZ Location:Sec:29 Twp: 6S 96WFootage: 1552 FSL  1131 FWL
Bottom Hole Location:Sec:29 Twp: 6S 96WFootage: 1552 FSL  1131 FWL
Log Types:CBL; RMTE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1404 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 0 ft., Bottom: 1404 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7656 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 766, Top: 3842 ft., Bottom: 7656 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2304 ft.NN
MESAVERDE4338 ft.NN
CAMEO6909 ft.NN
ROLLINS7464 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/30/2009                 Interval Top: 5765 ft.    Interval Bottom: 7378 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/13/2009Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/12/2009
Treatment Summary:3000 GALS 735% HCL; 779,700# 30/50 SAND; & 21,940 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7146 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2009Test Method:FLOWING
Hours Tested:21Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1076
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1340
CASING_PRESS 1414
MCF_GAS 1173
TUBING_PRESS 1202
Perforation Data:
Interval Top:5765 ft.# Of Holes:115
Interval Bottom:7378 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)16758
GOR698250
GOR DeterminationMCFE
Average BOE per Day7.981
Average MCFE per Day46.304

 Federal Financial Assurance  i Y

 Tribal Well  i No