|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/17/2012 Measured TD: 8247 ft. Vertical TD: 7765 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/17/2012 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/30/2013 | | Proposed Top PZ Location: | Sec:16 Twp: 6S 92W | Footage: 1472 FNL 1871 FWL | | Bottom Hole Location: | Sec:16 Twp: 6S 92W | Footage: 1472 FNL 1871 FWL | | Proposed Depth/Form: | 7642 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 191-25 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 523-2 , Unit Acreage: 320, Drill Unit: S/2 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 55# , Citings Type: PLANNED | | Cement: | Sacks: 177, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 24/32# , Citings Type: PLANNED | | Cement: | Sacks: 416, Top: 0 ft., Bottom: 1000 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7642 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 356, Top: , Bottom: 7642 ft. | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 8546 ft., Weight: 17# , Citings Type: PLANNED | | Cement: | Sacks: 798, Top: 4071 ft., Bottom: 8546 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/13/2012 | | Spud Date: | 2/12/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8247 ft. | Measured PB depth: | 8190 ft. | | True Vertical TD: | 7765 ft. | True Vertical PB depth: | 7708 ft. | | Top PZ Location: | Sec:9 Twp: 6S 92W | Footage: 588 FSL 795 FWL | | Bottom Hole Location: | Sec:9 Twp: 6S 92W | Footage: 580 FSL 785 FWL | | Log Types: | CBL, Mud, Temp | | Log Types: | CBL, Mud, Temp | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 84 ft., Weight: 84# , Citings Type: ACTUAL | | Cement: | Sacks: 177, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1073 ft., Weight: 32# , Citings Type: ACTUAL | | Cement: | Sacks: 365, Top: 0 ft., Bottom: 1084 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8237 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 1105, Top: 1996 ft., Bottom: 8247 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 4364 ft. | | | | | ROLLINS | 8070 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 5/17/2012 Interval Top: 6355 ft. Interval Bottom: 8031 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 4/30/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/20/2012 | | Treatment Summary: | WFCM - Frac'd with 91,294 bbls 2% KCL Slickwater, 1,680,650 lbs 20/40 sand and 197,200 lbs 20/40 SLC sand. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7553 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/17/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 700 | | BTU_GAS | 1129 | | CALC_BBLS_H2O | 700 | | CALC_MCF_GAS | 735 | | CASING_PRESS | 675 | | MCF_GAS | 735 | | TUBING_PRESS | 1750 |
| | Perforation Data: | | Interval Top: | 6355 ft. | # Of Holes: | 234 | | Interval Bottom: | 8031 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 385 |
| Total Gas Produced (MCF) | 24286 |
| GOR | 63080 |
| GOR Determination | MCFE |
| Average BOE per Day | 12.536 |
| Average MCFE per Day | 72.697 |
| Federal Financial Assurance | i | |
|
|