Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17018
Well Classification: GW Status: PR - 4/30/2009
Well Name/No:CLOUGH #RWF 342-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CACOC62978
Facility Status:PRStatus Date4/30/2009
FacilityID:298000LocationID:335494
County:GARFIELD #045Location:SWNE 29 6S94W 6
Field:RULISON - #75400Elevation:5229 ft.
Basin:PICEANCE BASIN  
Planned Location:1695FNL  2201 FELLat/Long: 39.498762 / -107.910303Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.498762 / -107.910301Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/30/2009             Measured TD: 7834 ft.    Vertical TD: 7616 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/30/2009
Wellbore PermitDIRECTIONAL
Permit #:20084229 Expiration Date:8/26/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1516 FNL  904 FEL
Bottom Hole Location:Sec:29 Twp: 6S 94W Footage: 1516 FNL  904 FEL
Proposed Depth/Form:7739 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:2/7/2009
Spud Date:1/22/2009Spud Date Is:ACTUAL
Measured TD:7834 ft.Measured PB depth:7785 ft.
True Vertical TD:7616 ft.True Vertical PB depth:7567 ft.
Top PZ Location:Sec:29 Twp: 6S 94WFootage: 1494 FNL  899 FEL
Bottom Hole Location:Sec:29 Twp: 6S 94WFootage: 1494 FNL  899 FEL
Log Types:CBL, HIGH RES.INDUCTION, SPECTRAL DENSITY,DUAL SPACED NEUTRON, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1164 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1164 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7815 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1355, Top: 3020 ft., Bottom: 7815 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1626 ft.NN
MESAVERDE4184 ft.NN
CAMEO6822 ft.NN
ROLLINS7768 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/30/2009                 Interval Top: 5414 ft.    Interval Bottom: 7630 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/4/2009Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/2/2009
Treatment Summary:3500 GALS 7.5% HCL; 882370# 20/40 SAND; 27548 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7281 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1044
CALC_GOR 0
CASING_PRESS 2037
MCF_GAS 1558
TUBING_PRESS 1920
Perforation Data:
Interval Top:5414 ft.# Of Holes:142
Interval Bottom:7630 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)60
Total Gas Produced (MCF)34152
GOR569200
GOR DeterminationMCFE
Average BOE per Day16.299
Average MCFE per Day94.558

 Federal Financial Assurance  i 

 Tribal Well  i No