Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-17002
Well Classification: GW Status: PR - 2/26/2009
Well Name/No:DIAMOND ELK #PA 334-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/26/2009
FacilityID:297900LocationID:335029
County:GARFIELD #045Location:SWSE 36 6S95W 6
Field:PARACHUTE - #67350Elevation:5447 ft.
Basin:PICEANCE BASIN  
Planned Location:979FSL  2455 FELLat/Long: 39.476490 / -107.946562Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.476486 / -107.946560Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/26/2009             Measured TD: 7913 ft.    Vertical TD: 7826 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/26/2009
Wellbore PermitDIRECTIONAL
Permit #:20091183 Expiration Date:7/12/2010
Proposed Top PZ Location:Sec: Twp: Footage: 914 FSL  1516 FEL
Bottom Hole Location:Sec:36 Twp: 6S 95W Footage: 914 FSL  1516 FEL
Proposed Depth/Form:7930 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:7/31/2009
Spud Date:7/24/2009Spud Date Is:ACTUAL
Measured TD:7913 ft.Measured PB depth:7863 ft.
True Vertical TD:7826 ft.True Vertical PB depth:7776 ft.
Top PZ Location:Sec:36 Twp: 6S 95WFootage: 962 FSL  1506 FEL
Bottom Hole Location:Sec:36 Twp: 6S 95WFootage: 962 FSL  1506 FEL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 90 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 803 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 270, Top: 0 ft., Bottom: 803 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7898 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 890, Top: 2890 ft., Bottom: 7898 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1971 ft.NN
MESAVERDE4318 ft.NN
CAMEO6752 ft.NN
ROLLINS7798 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/30/2009                Interval Top: 5716 ft.    Interval Bottom: 7654 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/2/2009Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/30/2009
Treatment Summary:3998 GLAS 7.5% HCL; 868997# 30/50 SAND; 24807 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7241 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1021
CASING_PRESS 1840
MCF_GAS 1111
TUBING_PRESS 1736
Perforation Data:
Interval Top:5716 ft.# Of Holes:143
Interval Bottom:7654 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)37
Total Gas Produced (MCF)29457
GOR796135
GOR DeterminationMCFE
Average BOE per Day14.021
Average MCFE per Day81.306

 Federal Financial Assurance  i 

 Tribal Well  i No