Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16998
Well Classification: GW Status: PR - 5/31/2009
Well Name/No:DIAMOND ELK #PA 534-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/31/2009
FacilityID:297896LocationID:335029
County:GARFIELD #045Location:SWSE 36 6S95W 6
Field:PARACHUTE - #67350Elevation:5447 ft.
Basin:PICEANCE BASIN  
Planned Location:980FSL  2522 FELLat/Long: 39.476484 / -107.946801Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.476482 / -107.946799Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/31/2009             Measured TD: 7790 ft.    Vertical TD: 7740 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/31/2009
Wellbore PermitDIRECTIONAL
Permit #:20084048 Expiration Date:8/20/2009
Proposed Top PZ Location:Sec: Twp: Footage: 396 FSL  2198 FWL
Bottom Hole Location:Sec:36 Twp: 6S 95W Footage: 396 FSL  2198 FWL
Proposed Depth/Form:7842 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:12/26/2008
Spud Date:12/18/2009Spud Date Is:ACTUAL
Measured TD:7790 ft.Measured PB depth:7736 ft.
True Vertical TD:7740 ft.True Vertical PB depth:
Top PZ Location:Sec:36 Twp: 6S 95WFootage: 391 FSL  2130 FWL
Bottom Hole Location:Sec:36 Twp: 6S 95WFootage: 391 FSL  2130 FWL
Log Types:CBL; HIGH RES IND, SPECTRAL DENSITY, DUAL SPACED NEUTRON; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1117 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 0 ft., Bottom: 1117 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7769 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 974, Top: 2630 ft., Bottom: 7769 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1922 ft.NN
MESAVERDE4264 ft.NN
CAMEO6755 ft.NN
ROLLINS7737 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/31/2009                 Interval Top: 5623 ft.    Interval Bottom: 7624 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/26/2009Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/25/2009
Treatment Summary:3573 GALS 7.5% HCL; 939,300# 30/50 SAND; & 20,422 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7207 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/31/2009Test Method:FLOWING
Hours Tested:19Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1021
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1251
CASING_PRESS 789
MCF_GAS 991
TUBING_PRESS 552
Perforation Data:
Interval Top:5623 ft.# Of Holes:146
Interval Bottom:7624 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)16100
GOR805000
GOR DeterminationMCFE
Average BOE per Day7.649
Average MCFE per Day44.358

 Federal Financial Assurance  i 

 Tribal Well  i No