Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16994
Well Classification: GW Status: PR - 2/26/2009
Well Name/No:DIAMOND ELK #PA 543-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/26/2009
FacilityID:297892LocationID:335029
County:GARFIELD #045Location:SWSE 36 6S95W 6
Field:PARACHUTE - #67350Elevation:5447 ft.
Basin:PICEANCE BASIN  
Planned Location:979FSL  2477 FELLat/Long: 39.476488 / -107.946642Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.476484 / -107.946640Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/26/2009             Measured TD: 8315 ft.    Vertical TD: 7824 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/26/2009
Wellbore PermitDIRECTIONAL
Permit #:20091193 Expiration Date:7/12/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1511 FSL  331 FEL
Bottom Hole Location:Sec:36 Twp: 6S 95W Footage: 1511 FSL  331 FEL
Proposed Depth/Form:8351 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:7/23/2009
Spud Date:7/15/2009Spud Date Is:ACTUAL
Measured TD:8315 ft.Measured PB depth:8260 ft.
True Vertical TD:7824 ft.True Vertical PB depth:7769 ft.
Top PZ Location:Sec:36 Twp: 6S 95WFootage: 1608 FSL  331 FEL
Bottom Hole Location:Sec:36 Twp: 6S 95WFootage: 1608 FSL  331 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 67 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 67 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 980 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 0 ft., Bottom: 980 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8295 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 985, Top: 2200 ft., Bottom: 8295 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1967 ft.NN
MESAVERDE4786 ft.NN
CAMEO7217 ft.NN
ROLLINS8236 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/30/2009                Interval Top: 6164 ft.    Interval Bottom: 8138 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/29/2009Choke Size:0.156 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/28/2009
Treatment Summary:3997 GALS 7.5% HCL; 756500# 30/50 SAND; 22543 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7769 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1023
CASING_PRESS 1991
MCF_GAS 1115
TUBING_PRESS 1817
Perforation Data:
Interval Top:6164 ft.# Of Holes:140
Interval Bottom:8138 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)16126
GOR806300
GOR DeterminationMCFE
Average BOE per Day7.676
Average MCFE per Day44.522

 Federal Financial Assurance  i 

 Tribal Well  i No