Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16993
Well Classification: GW Status: PR - 11/30/2009
Well Name/No:DIAMOND ELK #PA 443-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/30/2009
FacilityID:297891LocationID:335029
County:GARFIELD #045Location:SWSE 36 6S95W 6
Field:PARACHUTE - #67350Elevation:5447 ft.
Basin:PICEANCE BASIN  
Planned Location:979FSL  2485 FELLat/Long: 39.476487 / -107.946668Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.476485 / -107.946666Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/30/2009             Measured TD: 8375 ft.    Vertical TD: 7841 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/30/2009
Wellbore PermitDIRECTIONAL
Permit #:20091192 Expiration Date:7/12/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1833 FSL  261 FEL
Bottom Hole Location:Sec:36 Twp: 6S 95W Footage: 1833 FSL  261 FEL
Proposed Depth/Form:8387 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:6/28/2009
Spud Date:6/20/2009Spud Date Is:ACTUAL
Measured TD:8375 ft.Measured PB depth:8324 ft.
True Vertical TD:7841 ft.True Vertical PB depth:7790 ft.
Top PZ Location:Sec:36 Twp: 6S 95WFootage: 1932 FSL  282 FEL
Bottom Hole Location:Sec:36 Twp: 6S 95WFootage: 1932 FSL  282 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 88 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 88 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1081 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 311, Top: 0 ft., Bottom: 1081 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8359 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1035, Top: 3280 ft., Bottom: 8359 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1977 ft.NN
MESAVERDE4760 ft.NN
CAMEO7263 ft.NN
ROLLINS8275 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/30/2009                Interval Top: 6220 ft.    Interval Bottom: 8157 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/29/2009Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/28/2009
Treatment Summary:3998 GALS 7 1/2% HCL; 734400# 30/50 SAND; 21039 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:7777 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2009Test Method:FFLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1076
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CASING_PRESS 1405
MCF_GAS 990
TUBING_PRESS 1148
Perforation Data:
Interval Top:6220 ft.# Of Holes:131
Interval Bottom:8157 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)15585
GOR779250
GOR DeterminationMCFE
Average BOE per Day7.415
Average MCFE per Day43.037

 Federal Financial Assurance  i 

 Tribal Well  i No