Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16926
Well Classification: GW Status: PR - 8/13/2008
Well Name/No:PUCKETT #GM 324-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24099
Facility Status:PRStatus Date8/13/2008
FacilityID:297718LocationID:335087
County:GARFIELD #045Location:NESW 32 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5736 ft.
Basin:PICEANCE BASIN  
Planned Location:2621FSL  2284 FWLLat/Long: 39.480392 / -108.133619Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.480391 / -108.133621Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/3/2008             Measured TD: 7190 ft.    Vertical TD: 6517 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/3/2008
Wellbore PermitDIRECTIONAL
Permit #:20083753 Expiration Date:8/12/2009
Proposed Top PZ Location:Sec: Twp: Footage: 236 FSL  1992 FWL
Bottom Hole Location:Sec:32 Twp: 6S 96W Footage: 236 FSL  1992 FWL
Proposed Depth/Form:7189 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 320, Drill Unit: W/2 32

Wellbore Completed
Completion Date:12/26/2008
Spud Date:12/16/2008Spud Date Is:ACTUAL
Measured TD:7190 ft.Measured PB depth:7135 ft.
True Vertical TD:6517 ft.True Vertical PB depth:6462 ft.
Top PZ Location:Sec:32 Twp: 6S 96WFootage: 245 FSL  1946 FWL
Bottom Hole Location:Sec:32 Twp: 6S 96WFootage: 245 FSL  1946 FWL
Log Types:CBL; RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1283 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1283 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7184 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 952, Top: 3595 ft., Bottom: 7184 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2215 ft.NN
MESAVERDE4010 ft.NN
CAMEO6564 ft.NN
ROLLINS7054 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/30/2009                 Interval Top: 5339 ft.    Interval Bottom: 6911 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/12/2009Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/11/2009
Treatment Summary:3008 GALS 7.5% HCL; 802,200# 30/50 SAND; 21637 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6623 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2009Test Method:FLOWING
Hours Tested:21Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1057
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1446
GRAVITY_OIL 55
MCF_GAS 1173
TUBING_PRESS 1307
Perforation Data:
Interval Top:5339 ft.# Of Holes:106
Interval Bottom:6911 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)33
Total Gas Produced (MCF)19901
GOR603060
GOR DeterminationMCFE
Average BOE per Day9.488
Average MCFE per Day55.018

 Federal Financial Assurance  i Y

 Tribal Well  i No