Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16925
Well Classification: GW Status: PR - 8/13/2008
Well Name/No:PUCKETT #GM 524-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24099
Facility Status:PRStatus Date8/13/2008
FacilityID:297717LocationID:335087
County:GARFIELD #045Location:NESW 32 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5736 ft.
Basin:PICEANCE BASIN  
Planned Location:2610FSL  2295 FWLLat/Long: 39.480361 / -108.133583Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.480361 / -108.133584Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/3/2008             Measured TD: 6965 ft.    Vertical TD: 6475 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/3/2008
Wellbore PermitDIRECTIONAL
Permit #:20083747 Expiration Date:8/12/2009
Proposed Top PZ Location:Sec: Twp: Footage: 597 FSL  2331 FWL
Bottom Hole Location:Sec:32 Twp: 6S 96W Footage: 597 FSL  2331 FWL
Proposed Depth/Form:6981 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 10-9 , Unit Acreage: 320, Drill Unit: W2 32

Wellbore Completed
Completion Date:12/15/2008
Spud Date:12/4/2008Spud Date Is:ACTUAL
Measured TD:6965 ft.Measured PB depth:6906 ft.
True Vertical TD:6475 ft.True Vertical PB depth:6430 ft.
Top PZ Location:Sec:32 Twp: 6S 96WFootage: 603 FSL  2296 FWL
Bottom Hole Location:Sec:32 Twp: 6S 96WFootage: 603 FSL  2296 FWL
Log Types:CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1028 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1028 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6953 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 970, Top: 3625 ft., Bottom: 6953 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2106 ft.NN
MESAVERDE3904 ft.NN
CAMEO6408 ft.NN
ROLLINS6901 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/30/2009                 Interval Top: 5271 ft.    Interval Bottom: 6773 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/12/2009Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/11/2009
Treatment Summary:3014 GALS 7.5% HCL; 757,900# 30/50 SAND; & 20,599 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6507 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2009Test Method:FLOWING
Hours Tested:21Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1403
MCF_GAS 1077
TUBING_PRESS 1305
Perforation Data:
Interval Top:5271 ft.# Of Holes:112
Interval Bottom:6773 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)12553
GOR627650
GOR DeterminationMCFE
Average BOE per Day5.987
Average MCFE per Day34.725

 Federal Financial Assurance  i Y

 Tribal Well  i No