Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16906
Well Classification: GW Status: PR - 6/1/2011
Well Name/No:SAVAGE #RWF 33-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CACOC60596
Facility Status:PRStatus Date6/1/2011
FacilityID:297644LocationID:334888
County:GARFIELD #045Location:SWSE 34 6S94W 6
Field:RULISON - #75400Elevation:5626 ft.
Basin:PICEANCE BASIN  
Planned Location:560FSL  1987 FELLat/Long: 39.476100 / -107.871583Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.476097 / -107.871577Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/1/2011             Measured TD: 8213 ft.    Vertical TD: 7782 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/1/2011
Wellbore PermitDIRECTIONAL
Permit #:20091072 Expiration Date:7/9/2010
Proposed Top PZ Location:Sec: Twp: Footage: 2429 FSL  1971 FEL
Bottom Hole Location:Sec:34 Twp: 6S 94W Footage: 2429 FSL  1971 FEL
Proposed Depth/Form:8292 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-66 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:2/10/2010
Spud Date:2/1/2010Spud Date Is:ACTUAL
Measured TD:8213 ft.Measured PB depth:8161 ft.
True Vertical TD:7782 ft.True Vertical PB depth:7730 ft.
Top PZ Location:Sec:34 Twp: 6S 94WFootage: 2488 FSL  2389 FEL
Bottom Hole Location:Sec:34 Twp: 6S 94WFootage: 2450 FSL  2380 FEL
Log Types:CBL, MUD
Log Types:CBL,RPM
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 42 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2080 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 516, Top: 0 ft., Bottom: 2080 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8193 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1287, Top: 950 ft., Bottom: 8193 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND1748 ft.
WASATCH G1748 ft.NN
MESAVERDE4552 ft.
CAMEO7254 ft.
ROLLINS8109 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/1/2011                  Interval Top: 6084 ft.    Interval Bottom: 8005 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/2/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/31/2010
Treatment Summary:4000GALS 7 1/2% HCL; 866086# 20/40 SAND; 27098 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7676 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/31/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1063
CASING_PRESS 2326
MCF_GAS 1073
TUBING_PRESS 2135
Perforation Data:
Interval Top:6084 ft.# Of Holes:176
Interval Bottom:8005 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)45
Total Gas Produced (MCF)25237
GOR560822
GOR DeterminationMCFE
Average BOE per Day12.054
Average MCFE per Day69.896

 Federal Financial Assurance  i 

 Tribal Well  i No