|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 6/1/2011 Measured TD: 7762 ft. Vertical TD: 7717 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 6/1/2011 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20091077 | Expiration Date: | 7/12/2010 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1197 FSL 1938 FEL | | Bottom Hole Location: | Sec:34 Twp: 6S 94W | Footage: 1197 FSL 1938 FEL | | Proposed Depth/Form: | 7874 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-66 , Unit Acreage: 640, Drill Unit: ALL | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1100 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7874 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 1/11/2010 | | Spud Date: | 12/23/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 7762 ft. | Measured PB depth: | 7728 ft. | | True Vertical TD: | 7717 ft. | True Vertical PB depth: | 7684 ft. | | Top PZ Location: | Sec:34 Twp: 6S 94W | Footage: 1193 FSL 1942 FEL | | Bottom Hole Location: | Sec:34 Twp: 6S 94W | Footage: 1166 FSL 1951 FEL | | Log Types: | CBL,RPM | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 65 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 24, Top: , Bottom: 65 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1186 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 0 ft., Bottom: 1186 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7753 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1245, Top: 3100 ft., Bottom: 7753 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 1637 ft. | | | | | MESAVERDE | 4134 ft. | | | | | CAMEO | 6837 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 6/1/2011 Interval Top: 5646 ft. Interval Bottom: 7595 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 3/17/2010 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/14/2010 | | Treatment Summary: | 3500 GALS 7 1/2% HCL; 962400# 20/40 SAND; 27913 BBLS SLICKWATER (SUMMARY) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7222 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/30/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1074 | | CASING_PRESS | 2380 | | MCF_GAS | 815 | | TUBING_PRESS | 2023 |
| | Perforation Data: | | Interval Top: | 5646 ft. | # Of Holes: | 138 | | Interval Bottom: | 7595 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 48 |
| Total Gas Produced (MCF) | 27176 |
| GOR | 566166 |
| GOR Determination | MCFE |
| Average BOE per Day | 12.969 |
| Average MCFE per Day | 75.220 |
| Federal Financial Assurance | i | |
|
|