Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16891
Well Classification: GW Status: PR - 8/8/2008
Well Name/No:SAVAGE #RWF 13-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CACOC60596
Facility Status:PRStatus Date8/8/2008
FacilityID:297602LocationID:334888
County:GARFIELD #045Location:SWSE 34 6S94W 6
Field:RULISON - #75400Elevation:5626 ft.
Basin:PICEANCE BASIN  
Planned Location:531FSL  1931 FELLat/Long: 39.476018 / -107.871702Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.476017 / -107.871697Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/4/2008             Measured TD: 8410 ft.    Vertical TD: 7821 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/4/2008
Wellbore PermitDIRECTIONAL
Permit #:20083908 Expiration Date:8/7/2009
Proposed Top PZ Location:Sec: Twp: Footage: 2204 FSL  1066 FWL
Bottom Hole Location:Sec:34 Twp: 6S 94W Footage: 2204 FSL  1066 FWL
Proposed Depth/Form:8631 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:1/16/2009
Spud Date:1/5/2009Spud Date Is:ACTUAL
Measured TD:8410 ft.Measured PB depth:8356 ft.
True Vertical TD:7821 ft.True Vertical PB depth:7767 ft.
Top PZ Location:Sec:34 Twp: 6S 94WFootage: 2105 FSL  1404 FWL
Bottom Hole Location:Sec:34 Twp: 6S 94WFootage: 2105 FSL  1404 FWL
Log Types:CBL, RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2080 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 470, Top: 0 ft., Bottom: 2080 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8390 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1300, Top: 2900 ft., Bottom: 8390 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1631 ft.NN
MESAVERDE4679 ft.NN
CAMEO7410 ft.NN
ROLLINS8271 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/31/2009                 Interval Top: 6319 ft.    Interval Bottom: 8178 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/19/2009Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/17/2009
Treatment Summary:5008 GALS 7.5% HCL; 669,800# 20/40 SAND; 22,086 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7841 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/31/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1067
CASING_PRESS 1409
MCF_GAS 1060
TUBING_PRESS 1186
Perforation Data:
Interval Top:6319 ft.# Of Holes:140
Interval Bottom:8178 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)48
Total Gas Produced (MCF)26820
GOR558750
GOR DeterminationMCFE
Average BOE per Day12.805
Average MCFE per Day74.267

 Federal Financial Assurance  i 

 Tribal Well  i No