Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16383
Well Classification: GW Status: PR - 4/1/2024
Well Name/No:JOHNSON FED. #5-04B
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC67149
Facility Status:PRStatus Date4/1/2024
FacilityID:297304LocationID:334423
County:GARFIELD #045Location:NWNW 5 8S93W 6
Field:MAMM CREEK - #52500Elevation:8227 ft.
Basin:PICEANCE BASIN  
Planned Location:1730FNL  162 FWLLat/Long: 39.399175 / -107.806052Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.399170 / -107.806050Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/28/2013
End Date: 8/28/2013
Reported: 10/17/2013
Originally Reported: 9/24/2013
Days to report: 50
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2024             Measured TD: 10310 ft.    Vertical TD: 10182 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20083849 Expiration Date:7/21/2009
Proposed Top PZ Location:Sec:5 Twp: 8s 93w Footage: 511 FNL  658 FWL
Bottom Hole Location:Sec:5 Twp: 8s 93w Footage: 533 FNL  632 FWL
Proposed Depth/Form:12015 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 139-87 , Unit Acreage: 657, Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-87 , Unit Acreage: 657, Drill Unit:

Wellbore Completed
Completion Date:2/9/2009
Spud Date:1/19/2009Spud Date Is:ACTUAL
Measured TD:10310 ft.Measured PB depth:10263 ft.
True Vertical TD:10182 ft.True Vertical PB depth:10135 ft.
Top PZ Location:Sec:5 Twp: 8s 93wFootage: 511 FNL  658 FWL
Bottom Hole Location:Sec:5 Twp: 8s 93wFootage: 533 FNL  632 FWL
Log Types:HRI, SD, DSN, GR, CAL, RMTE, TEMP, CBL, MUD
Log Types:HRI, SD, DSN, GR, CAL, RMTE, TEMP, CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 8.625 in., Top: 0 ft., Depth: 1550 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 1550 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10308 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1320, Top: 5950 ft., Bottom: 10308 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6684 ft.
ROLLINS10140 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/1/2024                  Interval Top: 8070 ft.    Interval Bottom: 9087 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/3/2013Choke Size:1.000 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/26/2013Treatment End Date:9/10/2013
Treatment Summary:Fracture stimulated with 87,983 bbls slickwater; 1,107,610 # 20/40 white sand; 529,310 # 30/50 white sand in 8 stages
Total fluid used in treatment (bbls):87983Max pressure during treatment (psi):7879
Total gas used in treatment (mcf):Fluid density (lbs/gal):0.84
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):155Min frac gradient (psi/ft):0.58
Recycled water used in treatment (bbls):87983Total flowback volume recovered (bbls):53138
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):1636730Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9087 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/14/2013Test Method:flowing
Hours Tested:1Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 16
BTU_GAS 1100
CALC_BBLS_H2O 384
CALC_MCF_GAS 1085
CASING_PRESS 1450
MCF_GAS 45
Perforation Data:
Interval Top:8070 ft.# Of Holes:216
Interval Bottom:9087 ft.Hole Size:3.05 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)268
Total Gas Produced (MCF)40466
GOR150992
GOR DeterminationMCFE
Average BOE per Day19.832
Average MCFE per Day115.025

 Federal Financial Assurance  i Y

 Tribal Well  i No