Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16378
Well Classification: GW Status: PR - 4/1/2024
Well Name/No:JOHNSON #5-06D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2024
FacilityID:297284LocationID:334423
County:GARFIELD #045Location:NWNW 5 8S93W 6
Field:MAMM CREEK - #52500Elevation:8228 ft.
Basin:PICEANCE BASIN  
Planned Location:1766FNL  179 FWLLat/Long: 39.399075 / -107.805992Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.399070 / -107.805990Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/26/2013
End Date: 8/26/2013
Reported: 9/23/2013
Days to report: 28
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2024             Measured TD: 10420 ft.    Vertical TD: 10147 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20083546 Expiration Date:7/20/2009
Proposed Top PZ Location:Sec:5 Twp: 8S 93W Footage: 2519 FNL  1977 FWL
Bottom Hole Location:Sec:5 Twp: 8S 93W Footage: 2519 FNL  1977 FWL
Proposed Depth/Form:12120 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 139-87 , Unit Acreage: 657, Drill Unit: N/2+
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-87 , Unit Acreage: 657, Drill Unit: N/2+

Wellbore Completed
Completion Date:12/24/2008
Spud Date:11/19/2008Spud Date Is:ACTUAL
Measured TD:10420 ft.Measured PB depth:10370 ft.
True Vertical TD:10147 ft.True Vertical PB depth:10097 ft.
Top PZ Location:Sec:5 Twp: 8S 93WFootage: 2519 FNL  1977 FWL
Bottom Hole Location:Sec:5 Twp: 8S 93WFootage: 2519 FNL  1977 FWL
Log Types:ACR, SD, DSN, TEMP, CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1550 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 0 ft., Bottom: 1550 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10415 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1548, Top: 4800 ft., Bottom: 10415 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6793 ft.NN
ROLLINS10232 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/1/2024                  Interval Top: 8197 ft.    Interval Bottom: 10113 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/10/2013Choke Size:20.000 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/26/2013Treatment End Date:9/12/2013
Treatment Summary:Fracture stimulated with 86,199 bbls slickwater; 1,087,230 # 20/40 white sand; 490,100 # 30/50 white sand in 8 stages
Total fluid used in treatment (bbls):86354Max pressure during treatment (psi):7719
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):155Min frac gradient (psi/ft):0.61
Recycled water used in treatment (bbls):86199Total flowback volume recovered (bbls):38214
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):1577330Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9139 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/17/2013Test Method:flowing
Hours Tested:1Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 30
BTU_GAS 1100
CALC_BBLS_H2O 720
CALC_MCF_GAS 1136
CASING_PRESS 2650
MCF_GAS 47
TUBING_PRESS 1650
Perforation Data:
Interval Top:8197 ft.# Of Holes:228
Interval Bottom:10113 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)245
Total Gas Produced (MCF)37508
GOR153093
GOR DeterminationMCFE
Average BOE per Day18.396
Average MCFE per Day106.674

 Federal Financial Assurance  i 

 Tribal Well  i No