Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16347
Well Classification: GW Status: PR - 7/17/2008
Well Name/No:PUCKETT #GM 21-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/17/2008
FacilityID:297235LocationID:334811
County:GARFIELD #045Location:SWNW 6 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6398 ft.
Basin:PICEANCE BASIN  
Planned Location:1307FNL  1251 FWLLat/Long: 39.469584 / -108.154782Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.469571 / -108.154822Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/16/2008             Measured TD: 7225 ft.    Vertical TD: 7014 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/16/2008
Wellbore PermitDIRECTIONAL
Permit #:20083399 Expiration Date:7/16/2009
Proposed Top PZ Location:Sec: Twp: Footage: 225 FNL  2165 FWL
Bottom Hole Location:Sec:6 Twp: 7S 96W Footage: 225 FNL  2165 FWL
Proposed Depth/Form:7386 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-20 , Unit Acreage: 160, Drill Unit: NW/4

Wellbore Completed
Completion Date:1/27/2009
Spud Date:1/19/2009Spud Date Is:ACTUAL
Measured TD:7225 ft.Measured PB depth:7146 ft.
True Vertical TD:7014 ft.True Vertical PB depth:6935 ft.
Top PZ Location:Sec:6 Twp: 6S 96WFootage: 222 FNL  2160 FWL
Bottom Hole Location:Sec:6 Twp: 6S 96WFootage: 222 FNL  2160 FWL
Log Types:CBL; RMTE, MUD-2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 764 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 235, Top: 0 ft., Bottom: 764 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7210 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 782, Top: 2636 ft., Bottom: 7210 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2570 ft.NN
MESAVERDE4186 ft.NN
CAMEO6561 ft.NN
ROLLINS7088 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/11/2009                 Interval Top: 5647 ft.    Interval Bottom: 7011 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/20/2009Choke Size:0.750 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/9/2009
Treatment Summary:2750 GALS 7.5% HCL; 305,900# 30/50 & 475,300# 20/40 SAND; 22056 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6710 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/11/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1065
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1375
GRAVITY_OIL 55
MCF_GAS 1557
TUBING_PRESS 1191
Perforation Data:
Interval Top:5647 ft.# Of Holes:99
Interval Bottom:7011 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)15755
GOR562678
GOR DeterminationMCFE
Average BOE per Day7.519
Average MCFE per Day43.620

 Federal Financial Assurance  i 

 Tribal Well  i No