Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16343
Well Classification: GW Status: PR - 7/17/2008
Well Name/No:PUCKETT #GM 421-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/17/2008
FacilityID:297231LocationID:334811
County:GARFIELD #045Location:SWNW 6 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6397 ft.
Basin:PICEANCE BASIN  
Planned Location:1320FNL  1252 FWLLat/Long: 39.469550 / -108.154779Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.469538 / -108.154820Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/16/2008             Measured TD: 7047 ft.    Vertical TD: 6955 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/16/2008
Wellbore PermitDIRECTIONAL
Permit #:20083397 Expiration Date:7/16/2009
Proposed Top PZ Location:Sec: Twp: Footage: 857 FNL  2083 FWL
Bottom Hole Location:Sec:6 Twp: 7S 96W Footage: 857 FNL  2083 FWL
Proposed Depth/Form:7168 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-20 , Unit Acreage: 160, Drill Unit: NW/4

Wellbore Completed
Completion Date:1/11/2009
Spud Date:1/3/2009Spud Date Is:ACTUAL
Measured TD:7047 ft.Measured PB depth:6990 ft.
True Vertical TD:6955 ft.True Vertical PB depth:6898 ft.
Top PZ Location:Sec:6 Twp: 7S 96WFootage: 863 FNL  2075 FWL
Bottom Hole Location:Sec:6 Twp: 7S 96WFootage: 863 FNL  2075 FWL
Log Types:CBL; RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 760 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 235, Top: 0 ft., Bottom: 760 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 7026 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 762, Top: 2858 ft., Bottom: 7026 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2511 ft.NN
MESAVERDE4056 ft.NN
CAMEO6425 ft.NN
ROLLINS6943 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/17/2009                 Interval Top: 5509 ft.    Interval Bottom: 6797 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/16/2009Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/2/2009
Treatment Summary:2750 GALS 7.5% HCL; 626,000# 30/50 SAND; 19,097 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6566 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/17/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1075
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1010
GRAVITY_OIL 55
MCF_GAS 1098
TUBING_PRESS 806
Perforation Data:
Interval Top:5509 ft.# Of Holes:90
Interval Bottom:6797 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)35
Total Gas Produced (MCF)19644
GOR561257
GOR DeterminationMCFE
Average BOE per Day9.376
Average MCFE per Day54.357

 Federal Financial Assurance  i 

 Tribal Well  i No