Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16342
Well Classification: GW Status: PR - 7/17/2008
Well Name/No:PUCKETT #GM 322-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/17/2008
FacilityID:297230LocationID:334811
County:GARFIELD #045Location:SWNW 6 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6397 ft.
Basin:PICEANCE BASIN  
Planned Location:1330FNL  1241 FWLLat/Long: 39.469522 / -108.154818Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.469511 / -108.154861Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/16/2008             Measured TD: 7030 ft.    Vertical TD: 6929 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/16/2008
Wellbore PermitDIRECTIONAL
Permit #:20083395 Expiration Date:7/16/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1675 FNL  2133 FWL
Bottom Hole Location:Sec:6 Twp: 7S 96W Footage: 1675 FNL  2133 FWL
Proposed Depth/Form:7048 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-20 , Unit Acreage: 160, Drill Unit: NW/4

Wellbore Completed
Completion Date:12/7/2008
Spud Date:11/30/2008Spud Date Is:ACTUAL
Measured TD:7030 ft.Measured PB depth:6962 ft.
True Vertical TD:6929 ft.True Vertical PB depth:6861 ft.
Top PZ Location:Sec:6 Twp: 7S 96WFootage: 1670 FNL  2147 FWL
Bottom Hole Location:Sec:6 Twp: 7S 96WFootage: 1670 FNL  2147 FWL
Log Types:CBL; RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 67 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 67 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 765 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 215, Top: 0 ft., Bottom: 765 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6980 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 668, Top: 3120 ft., Bottom: 6980 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2515 ft.NN
MESAVERDE4055 ft.NN
CAMEO6420 ft.NN
ROLLINS6910 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/30/2009                 Interval Top: 5500 ft.    Interval Bottom: 6769 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/4/2009Choke Size:0.281 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/30/2009
Treatment Summary:2750 GALS 7.5% HCL; 486,500# 30/50 SAND; 15,751 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6533 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2009Test Method:FLOWING
Hours Tested:21Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1084
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 507
MCF_GAS 925
TUBING_PRESS 299
Perforation Data:
Interval Top:5500 ft.# Of Holes:82
Interval Bottom:6769 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)44
Total Gas Produced (MCF)26454
GOR601227
GOR DeterminationMCFE
Average BOE per Day12.616
Average MCFE per Day73.167

 Federal Financial Assurance  i 

 Tribal Well  i No