Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16333
Well Classification: GW Status: PR - 6/30/2010
Well Name/No:FEDERAL #RWF 433-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C46030
Facility Status:PRStatus Date6/30/2010
FacilityID:297158LocationID:334848
County:GARFIELD #045Location:SWSE 4 7S94W 6
Field:RULISON - #75400Elevation:6272 ft.
Basin:PICEANCE BASIN  
Planned Location:655FSL  2059 FELLat/Long: 39.461785 / -107.890370Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.461794 / -107.890369Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/30/2010             Measured TD: 8578 ft.    Vertical TD: 8433 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/30/2010
Wellbore PermitDIRECTIONAL
Permit #:20091136 Expiration Date:5/7/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1799 FSL  2027 FEL
Bottom Hole Location:Sec:4 Twp: 7S 94W Footage: 1799 FSL  2027 FEL
Proposed Depth/Form:8538 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:5/29/2009
Spud Date:5/21/2009Spud Date Is:ACTUAL
Measured TD:8578 ft.Measured PB depth:8534 ft.
True Vertical TD:8433 ft.True Vertical PB depth:8389 ft.
Top PZ Location:Sec:4 Twp: 7S 94WFootage: 1807 FSL  2040 FEL
Bottom Hole Location:Sec:4 Twp: 7S 94WFootage: 1814 FSL  2056 FEL
Log Types:CBL, RMP
Log Types:CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 31, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1119 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1119 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8566 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 975, Top: 2720 ft., Bottom: 8566 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
J SAND2528 ft.
WASATCH G2528 ft.NN
MESAVERDE4988 ft.
CAMEO7552 ft.
ROLLINS8465 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/30/2010                 Interval Top: 6600 ft.    Interval Bottom: 8341 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/5/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/3/2010
Treatment Summary:3509 GALS 7 1/2% HCL: 530400 # 20/40 SAND: 15864 BBLS SLICKWATER(SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8080 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1047
CALC_MCF_GAS 983
CASING_PRESS 1335
MCF_GAS 983
TUBING_PRESS 1107
Perforation Data:
Interval Top:6600 ft.# Of Holes:109
Interval Bottom:8341 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)31
Total Gas Produced (MCF)16457
GOR530870
GOR DeterminationMCFE
Average BOE per Day7.858
Average MCFE per Day45.587

 Federal Financial Assurance  i Y

 Tribal Well  i No