Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16325
Well Classification: GW Status: PR - 6/30/2010
Well Name/No:FEDERAL #RWF 333-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C-46030
Facility Status:PRStatus Date6/30/2010
FacilityID:297150LocationID:334848
County:GARFIELD #045Location:SWSE 4 7S94W 6
Field:RULISON - #75400Elevation:6272 ft.
Basin:PICEANCE BASIN  
Planned Location:665FSL  2067 FELLat/Long: 39.461812 / -107.890397Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.461820 / -107.890397Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/30/2010             Measured TD: 8634 ft.    Vertical TD: 8422 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/30/2010
Wellbore PermitDIRECTIONAL
Permit #:20091137 Expiration Date:5/7/2010
Proposed Top PZ Location:Sec: Twp: Footage: 2114 FSL  2021 FEL
Bottom Hole Location:Sec:4 Twp: 7S 94W Footage: 2114 FSL  2021 FEL
Proposed Depth/Form:8623 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:5/10/2009
Spud Date:4/29/2009Spud Date Is:ACTUAL
Measured TD:8634 ft.Measured PB depth:8591 ft.
True Vertical TD:8422 ft.True Vertical PB depth:8379 ft.
Top PZ Location:Sec:4 Twp: 7S 94WFootage: 2117 FSL  2047 FEL
Bottom Hole Location:Sec:4 Twp: 7S 94WFootage: 2119 FSL  2049 FEL
Log Types:CBL, HIGH RES.IND.,SPECTRAL DENSITY, DUAL SPACED NEUTRON
Log Types:SP/GR/HDIL/ZDL/CN AND CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 86 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 32, Top: , Bottom: 86 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1158 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: , Bottom: 1158 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8623 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 896, Top: 3560 ft., Bottom: 8623 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2544 ft.
WASATCH G2544 ft.NN
MESAVERDE5043 ft.
CAMEO7601 ft.
ROLLINS8528 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/30/2010                 Interval Top: 6203 ft.    Interval Bottom: 8196 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/7/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/3/2010
Treatment Summary:4500 GALS 7 1/2% HCL; 919900 # 20/40 SAND; 23037 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8003 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2010Test Method:FLWOING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1053
CASING_PRESS 2157
MCF_GAS 992
TUBING_PRESS 2116
Perforation Data:
Interval Top:6203 ft.# Of Holes:130
Interval Bottom:8196 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)52
Total Gas Produced (MCF)26631
GOR512134
GOR DeterminationMCFE
Average BOE per Day12.717
Average MCFE per Day73.800

 Federal Financial Assurance  i Y

 Tribal Well  i No