Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16312
Well Classification: GW Status: PR - 3/9/2009
Well Name/No:CHEVRON #TR 311-25-597
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/9/2009
FacilityID:297107LocationID:335916
County:GARFIELD #045Location:SWNW 25 5S97W 6
Field:TRAIL RIDGE - #83825Elevation:8430 ft.
Basin:PICEANCE BASIN  
Planned Location:1658FNL  1062 FWLLat/Long: 39.587353 / -108.232461Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.587352 / -108.232462Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/9/2009             Measured TD: 9713 ft.    Vertical TD: 9534 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/9/2009
Wellbore PermitDIRECTIONAL
Permit #:20082992 Expiration Date:7/10/2009
Proposed Top PZ Location:Sec: Twp: Footage: 321 FNL  615 FWL
Bottom Hole Location:Sec:25 Twp: 5S 97W Footage: 321 FNL  615 FWL
Proposed Depth/Form:9774 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-17 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/10/2008
Spud Date:11/13/2008Spud Date Is:ACTUAL
Measured TD:9713 ft.Measured PB depth:9664 ft.
True Vertical TD:9534 ft.True Vertical PB depth:9485 ft.
Top PZ Location:Sec:25 Twp: 5S 97WFootage: 303 FNL  650 FWL
Bottom Hole Location:Sec:25 Twp: 5S 97WFootage: 303 FNL  650 FWL
Log Types:CBL, RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2835 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1725, Top: 0 ft., Bottom: 2835 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9693 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 778, Top: 3550 ft., Bottom: 9693 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE6538 ft.NN
CAMEO9120 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/9/2009                  Interval Top: 7446 ft.    Interval Bottom: 9516 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/25/2009Choke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/25/2009
Treatment Summary:8064 GAL HCL ACID, 1,067,797# 20/40 SAND, 26,416 BBLS WATER, 105 TONS CO2.
Tubing Size:2.333333 in.Tubing Setting Depth:9469 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/9/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1058
CALC_GOR 0
CASING_PRESS 800
MCF_GAS 1270
TUBING_PRESS 600
Perforation Data:
Interval Top:7446 ft.# Of Holes:197
Interval Bottom:9516 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)31
Total Gas Produced (MCF)16712
GOR539096
GOR DeterminationMCFE
Average BOE per Day7.979
Average MCFE per Day46.293

 Federal Financial Assurance  i 

 Tribal Well  i No