Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16310
Well Classification: GW Status: PR - 11/1/2011
Well Name/No:CHEVRON #TR 411-25-597
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2011
FacilityID:297105LocationID:335916
County:GARFIELD #045Location:SWNW 25 5S97W 6
Field:TRAIL RIDGE - #83825Elevation:8430 ft.
Basin:PICEANCE BASIN  
Planned Location:1664FNL  1066 FWLLat/Long: 39.587336 / -108.232445Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.587336 / -108.232446Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2012             Measured TD: 9632 ft.    Vertical TD: 9513 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2012
Wellbore PermitDIRECTIONAL
Permit #:20082990 Expiration Date:7/10/2009
Proposed Top PZ Location:Sec: Twp: Footage: 662 FNL  640 FWL
Bottom Hole Location:Sec:25 Twp: 5S 97W Footage: 662 FNL  640 FWL
Proposed Depth/Form:9710 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-17 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/1/2008
Spud Date:11/17/2008Spud Date Is:ACTUAL
Measured TD:9632 ft.Measured PB depth:9513 ft.
True Vertical TD:9513 ft.True Vertical PB depth:9394 ft.
Top PZ Location:Sec:25 Twp: 5S 97WFootage: 601 FNL  657 FWL
Bottom Hole Location:Sec:25 Twp: 5S 97WFootage: 642 FNL  613 FWL
Log Types:CBL, RMTE, MUD
Log Types:CBL, RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: , Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2812 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1400, Top: 0 ft., Bottom: 2812 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9600 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 777, Top: 4650 ft., Bottom: 9600 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE6457 ft.
CAMEO9047 ft.
ROLLINS9481 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/1/2012                  Interval Top: 7152 ft.    Interval Bottom: 9462 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/29/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/26/2010
Treatment Summary:9489 GALS OF 10% ACID, 157329# 20/40 SADN; 48036 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:9386 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/20/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1
CASING_PRESS 989
MCF_GAS 853
TUBING_PRESS 975
Perforation Data:
Interval Top:7152 ft.# Of Holes:231
Interval Bottom:9462 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)45
Total Gas Produced (MCF)24557
GOR545711
GOR DeterminationMCFE
Average BOE per Day11.725
Average MCFE per Day67.978

 Federal Financial Assurance  i 

 Tribal Well  i No