Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16309
Well Classification: GW Status: PR - 11/1/2011
Well Name/No:CHEVRON #TR 511-25-597
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2011
FacilityID:297104LocationID:335916
County:GARFIELD #045Location:SWNW 25 5S97W 6
Field:TRAIL RIDGE - #83825Elevation:8430 ft.
Basin:PICEANCE BASIN  
Planned Location:1670FNL  1070 FWLLat/Long: 39.587320 / -108.232429Lat/Long Source: Field Measured
As Drilled Location:1670 FNL  1070 FWLLat/Long: 39.587319 / -108.232430Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2012             Measured TD: 9555 ft.    Vertical TD: 9487 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2012
Wellbore PermitDIRECTIONAL
Permit #:20082989 Expiration Date:7/10/2009
Proposed Top PZ Location:Sec: Twp: Footage: 922 FNL  648 FWL
Bottom Hole Location:Sec:25 Twp: 5S 97W Footage: 922 FNL  648 FWL
Proposed Depth/Form:9663 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-17 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/19/2008
Spud Date:11/10/2008Spud Date Is:ACTUAL
Measured TD:9555 ft.Measured PB depth:9534 ft.
True Vertical TD:9487 ft.True Vertical PB depth:9466 ft.
Top PZ Location:Sec:25 Twp: 5S 97WFootage: 918 FNL  674 FWL
Bottom Hole Location:Sec:25 Twp: 5S 97WFootage: 937 FNL  628 FWL
Log Types:CBL, RMTE, MUD
Log Types:CBL, RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: , Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2770 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1775, Top: , Bottom: 2770 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9542 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 778, Top: 6100 ft., Bottom: 9542 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE6396 ft.
CAMEO8991 ft.
ROLLINS9420 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/1/2012                  Interval Top: 7312 ft.    Interval Bottom: 9394 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/7/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/25/2010
Treatment Summary:3745 GALS OF 10% HCL ACID; 582610# 20/40 SAND; 17354 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:9300 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/20/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1066
CASING_PRESS 1312
MCF_GAS 1086
TUBING_PRESS 895
Perforation Data:
Interval Top:7312 ft.# Of Holes:76
Interval Bottom:9394 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)33
Total Gas Produced (MCF)18403
GOR557666
GOR DeterminationMCFE
Average BOE per Day8.792
Average MCFE per Day51.015

 Federal Financial Assurance  i 

 Tribal Well  i No