Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16308
Well Classification: GW Status: PR - 1/1/2025
Well Name/No:CHEVRON #TR512-25-597
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2025
FacilityID:297103LocationID:335916
County:GARFIELD #045Location:SWNW 25 5S97W 6
Field:TRAIL RIDGE - #83825Elevation:8430 ft.
Basin:PICEANCE BASIN  
Planned Location:1706FNL  1097 FWLLat/Long: 39.587221 / -108.232334Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.587221 / -108.232333Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2025             Measured TD: 9587 ft.    Vertical TD: 9502 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20082987 Expiration Date:7/10/2009
Proposed Top PZ Location:Sec: Twp: Footage: 2586 FNL  636 FWL
Bottom Hole Location:Sec:25 Twp: 5S 97W Footage: 2586 FNL  636 FWL
Proposed Depth/Form:9683 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-17 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/30/2008
Spud Date:9/25/2008Spud Date Is:ACTUAL
Measured TD:9587 ft.Measured PB depth:9587 ft.
True Vertical TD:9502 ft.True Vertical PB depth:9502 ft.
Top PZ Location:Sec:25 Twp: 5S 97WFootage: 2586 FNL  641 FWL
Bottom Hole Location:Sec:25 Twp: 5S 97WFootage: 2586 FNL  641 FWL
Log Types:CBL, IND/ DENSITY/ NEUTRON, MUD(2)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2823 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1918, Top: 0 ft., Bottom: 2823 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9573 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 4350 ft., Bottom: 9573 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE6322 ft.NN
CAMEO8943 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2025                  Interval Top: 7235 ft.    Interval Bottom: 9348 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/4/2009Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/4/2009
Treatment Summary:7799 GAL HCL ACID, 1,090,985# 20/40 SAND, 27,893 BBLS WTR AND245 TONS CO2.
Tubing Size:2.375 in.Tubing Setting Depth:9235 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/3/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1053
CALC_GOR 0
CALC_MCF_GAS 1300
CASING_PRESS 1850
MCF_GAS 1300
TUBING_PRESS 1700
Perforation Data:
Interval Top:7235 ft.# Of Holes:197
Interval Bottom:9348 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)32
Total Gas Produced (MCF)23903
GOR746968
GOR DeterminationMCFE
Average BOE per Day11.318
Average MCFE per Day65.666

 Federal Financial Assurance  i 

 Tribal Well  i No