Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16307
Well Classification: GW Status: PR - 12/1/2011
Well Name/No:CHEVRON #TR611-25-597
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2011
FacilityID:297102LocationID:335916
County:GARFIELD #045Location:SWNW 25 5S97W 6
Field:TRAIL RIDGE - #83825Elevation:8430 ft.
Basin:PICEANCE BASIN  
Planned Location:1682FNL  1079 FWLLat/Long: 39.587287 / -108.232397Lat/Long Source: Field Measured
As Drilled Location:1682 FNL  1079 FWLLat/Long: 39.587286 / -108.232397Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2012             Measured TD: 9539 ft.    Vertical TD: 9502 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2012
Wellbore PermitDIRECTIONAL
Permit #:20082988 Expiration Date:7/10/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1219 FNL  652 FWL
Bottom Hole Location:Sec:25 Twp: 5S 97W Footage: 1219 FNL  652 FWL
Proposed Depth/Form:9633 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-17 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/28/2008
Spud Date:11/1/2008Spud Date Is:ACTUAL
Measured TD:9539 ft.Measured PB depth:9436 ft.
True Vertical TD:9502 ft.True Vertical PB depth:9399 ft.
Top PZ Location:Sec:25 Twp: 5S 97WFootage: 1207 FNL  679 FWL
Bottom Hole Location:Sec:25 Twp: 5S 97WFootage: 1256 FNL  655 FWL
Log Types:CBL, RMTE
Log Types:CBL, HRI, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2766 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1825, Top: 0 ft., Bottom: 2766 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9491 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 768, Top: 5120 ft., Bottom: 9491 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE6358 ft.
CAMEO8944 ft.
ROLLINS9377 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/1/2012                  Interval Top: 7230 ft.    Interval Bottom: 9357 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/29/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/25/2010
Treatment Summary:9716 GALS 10% HCL ACID; 1606996# 20/40 SAND; 72831 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.38 in.Tubing Setting Depth:9246 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/18/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1066
CASING_PRESS 1548
MCF_GAS 1193
TUBING_PRESS 1139
Perforation Data:
Interval Top:7230 ft.# Of Holes:232
Interval Bottom:9357 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)56
Total Gas Produced (MCF)33241
GOR593589
GOR DeterminationMCFE
Average BOE per Day15.858
Average MCFE per Day91.979

 Federal Financial Assurance  i 

 Tribal Well  i No