Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16238
Well Classification: GW Status: PR - 12/29/2008
Well Name/No:CHEVRON #TR 411-33-597
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/29/2008
FacilityID:296961LocationID:335915
County:GARFIELD #045Location:NENE 32 5S97W 6
Field:TRAIL RIDGE - #83825Elevation:8260 ft.
Basin:PICEANCE BASIN  
Planned Location:1028FNL  343 FELLat/Long: 39.574592 / -108.293498Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.574591 / -108.293498Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/29/2008             Measured TD: 8435 ft.    Vertical TD: 8342 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/29/2008
Wellbore PermitDIRECTIONAL
Permit #:20082916 Expiration Date:7/7/2009
Proposed Top PZ Location:Sec: Twp: Footage: 833 FNL  632 FWL
Bottom Hole Location:Sec:33 Twp: 5S 97W Footage: 833 FNL  632 FWL
Proposed Depth/Form:8515 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-17 (10, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/29/2008
Spud Date:9/15/2008Spud Date Is:ACTUAL
Measured TD:8435 ft.Measured PB depth:8375 ft.
True Vertical TD:8342 ft.True Vertical PB depth:
Top PZ Location:Sec:33 Twp: 5S 97WFootage: 834 FNL  631 FWL
Bottom Hole Location:Sec:33 Twp: 5S 97WFootage: 834 FNL  631 FWL
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2533 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1684, Top: 0 ft., Bottom: 2533 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8420 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 715, Top: 3700 ft., Bottom: 8420 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE5581 ft.NN
CAMEO7886 ft.NN
ROLLINS8276 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/29/2008                Interval Top: 6268 ft.    Interval Bottom: 8252 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/28/2008Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/6/2008
Treatment Summary:8062 GAL 10% HCL ACID, 1,000,474# 20/40 SAND, 27,049 BBLS WATR, 180 TONS CO2.
Tubing Size:2.375 in.Tubing Setting Depth:8156 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/29/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1
CALC_GOR 0
CASING_PRESS 1525
MCF_GAS 1100
TUBING_PRESS 1525
Perforation Data:
Interval Top:6268 ft.# Of Holes:204
Interval Bottom:8252 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)10822
GOR470521
GOR DeterminationMCFE
Average BOE per Day5.177
Average MCFE per Day30.028

 Federal Financial Assurance  i 

 Tribal Well  i No