Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16236
Well Classification: GW Status: PR - 1/7/2009
Well Name/No:CHEVRON #TR331-32-597
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/7/2009
FacilityID:296959LocationID:335915
County:GARFIELD #045Location:NENE 32 5S97W 6
Field:TRAIL RIDGE - #83825Elevation:8260 ft.
Basin:PICEANCE BASIN  
Planned Location:1012FNL  409 FELLat/Long: 39.574635 / -108.293731Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.574638 / -108.293730Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/7/2009             Measured TD: 8690 ft.    Vertical TD: 8404 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/7/2009
Wellbore PermitDIRECTIONAL
Permit #:20082918 Expiration Date:7/7/2009
Proposed Top PZ Location:Sec: Twp: Footage: 449 FNL  2033 FEL
Bottom Hole Location:Sec:32 Twp: 5S 97W Footage: 449 FNL  2033 FEL
Proposed Depth/Form:8730 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-17(10 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/14/2008
Spud Date:7/29/2008Spud Date Is:ACTUAL
Measured TD:8690 ft.Measured PB depth:8634 ft.
True Vertical TD:8404 ft.True Vertical PB depth:8348 ft.
Top PZ Location:Sec:32 Twp: 5S 97WFootage: 452 FNL  2036 FEL
Bottom Hole Location:Sec:32 Twp: 5S 97WFootage: 452 FNL  2036 FEL
Log Types:MUD, CBL, R M T E, HRI, SPEC-DENSITY, DUAL-SPACED NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2491 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 1600, Top: 0 ft., Bottom: 2491 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8676 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 725, Top: 3155 ft., Bottom: 8676 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE5730 ft.NN
CAMEO8010 ft.NN
ROLLINS8359 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/7/2009                  Interval Top: 6394 ft.    Interval Bottom: 8323 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/24/2009Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/6/2009
Treatment Summary:9204 GAL 10% HCL ACID BEFORE FRAC, 1248058# 20/40 SAND, 32853 BBLS SLICKWATER 304 TONS CO2.
Tubing Size:2.375 in.Tubing Setting Depth:6778 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/7/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1170
CALC_GOR 0
CASING_PRESS 1100
MCF_GAS 700
TUBING_PRESS 1250
Perforation Data:
Interval Top:6394 ft.# Of Holes:194
Interval Bottom:8323 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)104
Total Gas Produced (MCF)46905
GOR451009
GOR DeterminationMCFE
Average BOE per Day22.452
Average MCFE per Day130.225

 Federal Financial Assurance  i 

 Tribal Well  i No