|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 6/1/2025 Measured TD: 9135 ft. Vertical TD: 9091 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 6/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/8/2011 | | Proposed Top PZ Location: | Sec:24 Twp: 6S 97W | Footage: 2211 FSL 1957 FEL | | Bottom Hole Location: | Sec:24 Twp: 6S 97W | Footage: 2201 FSL 2014 FWL | | Proposed Depth/Form: | 9200 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 510-21 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: , Depth: 100 ft., Weight: 53 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 9.625 in., Top: , Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 800, Top: 0 ft., Bottom: 2500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 9100 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 996, Top: 5280 ft., Bottom: 9100 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/19/2010 | | Spud Date: | 6/26/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 9135 ft. | Measured PB depth: | 8969 ft. | | True Vertical TD: | 9091 ft. | True Vertical PB depth: | 8925 ft. | | Top PZ Location: | Sec:24 Twp: 6S 97W | Footage: 2211 FSL 1957 FEL | | Bottom Hole Location: | Sec:24 Twp: 6S 97W | Footage: 2201 FSL 2014 FWL | | Log Types: | PNDL/GR, PND-S CASED HOLE TRIPLE COMBO, CBL/GR MUD LOG | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2682 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1666, Top: 0 ft., Bottom: 2682 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9118 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 805, Top: 3450 ft., Bottom: 9118 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4326 ft. | | | | | FORT UNION | 4654 ft. | | | | | WILLIAMS FORK | 5922 ft. | | | | | CAMEO | 8439 ft. | | | | | ROLLINS | 8883 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 6/1/2025 Interval Top: 7214 ft. Interval Bottom: 8721 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 9/20/2010 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/8/2010 | | Treatment Summary: | FRAC'D USING 21933 BBLS OF SLICKWATER GEL AND 840697 LBS OF 30/50 WESH WHITE SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8652 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/1/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 118 | | BBLS_OIL | 4 | | BTU_GAS | 1073 | | CALC_BBLS_H2O | 118 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 285250 | | CALC_MCF_GAS | 1141 | | CASING_PRESS | 720 | | GRAVITY_OIL | 54 | | MCF_GAS | 1141 | | TUBING_PRESS | 432 |
| | Perforation Data: | | Interval Top: | 7214 ft. | # Of Holes: | 171 | | Interval Bottom: | 8721 ft. | Hole Size: | 0.31 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 56 |
| Total Gas Produced (MCF) | 16979 |
| GOR | 303196 |
| GOR Determination | MCFE |
| Average BOE per Day | 8.124 |
| Average MCFE per Day | 47.128 |
| Federal Financial Assurance | i | |
|
|