|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2012 Measured TD: 9235 ft. Vertical TD: 9172 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2012 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/8/2011 | | Proposed Top PZ Location: | Sec:24 Twp: 6S 97W | Footage: 131 FNL 697 FWL | | Bottom Hole Location: | Sec:24 Twp: 6S 67W | Footage: 140 FNL 671 FWL | | Proposed Depth/Form: | 9380 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 510-21 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: , Depth: 100 ft., Weight: 53 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 9.625 in., Top: , Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 800, Top: 0 ft., Bottom: 2500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 9280 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 954, Top: 5620 ft., Bottom: 9280 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/6/2010 | | Spud Date: | 9/24/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 9235 ft. | Measured PB depth: | 9136 ft. | | True Vertical TD: | 9172 ft. | True Vertical PB depth: | 9073 ft. | | Top PZ Location: | Sec:24 Twp: 6S 97W | Footage: 131 FNL 697 FWL | | Bottom Hole Location: | Sec:24 Twp: 6S 67W | Footage: 140 FNL 671 FWL | | Log Types: | PNDL/GR, PND-S CASED HOLE TRIPLE COMBO, CBL/GR | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 94 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2648 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1665, Top: 0 ft., Bottom: 2648 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9221 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 900, Top: 3750 ft., Bottom: 9221 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4422 ft. | | | | | FORT UNION | 4917 ft. | | | | | WILLIAMS FORK | 6175 ft. | | | | | CAMEO | 8679 ft. | | | | | ROLLINS | 9090 ft. | | | |
Formation WMFK Formation Classification: GW Status: PR - 5/1/2012 Interval Top: 7299 ft. Interval Bottom: 8944 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 2/18/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/28/2011 | | Treatment Summary: | Frac'd using 30028 bbls of slickwater gel and 554100 lbs of 30/50 mesh white sand, 169316 # Super LC Resin coated sand |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8821 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/31/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 107 | | BTU_GAS | 1079 | | CALC_BBLS_H2O | 107 | | CALC_MCF_GAS | 1199 | | CASING_PRESS | 986 | | MCF_GAS | 1199 | | TUBING_PRESS | 668 |
| | Perforation Data: | | Interval Top: | 7299 ft. | # Of Holes: | 162 | | Interval Bottom: | 8944 ft. | Hole Size: | 0.3125 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 50 |
| Total Gas Produced (MCF) | 17114 |
| GOR | 342280 |
| GOR Determination | MCFE |
| Average BOE per Day | 8.216 |
| Average MCFE per Day | 47.663 |
| Federal Financial Assurance | i | |
|
|