Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16088
Well Classification: GW Status: PR - 12/1/2017
Well Name/No:JUNIPER #2-9A (M1E)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2017
FacilityID:296609LocationID:334666
County:GARFIELD #045Location:SWSW 1 7S92W 6
Field:MAMM CREEK - #52500Elevation:6123 ft.
Basin:PICEANCE BASIN  
Planned Location:1239FSL  360 FWLLat/Long: 39.472286 / -107.623175Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.472290 / -107.623170Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2017             Measured TD: 6540 ft.    Vertical TD: 6209 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2017
Wellbore PermitDIRECTIONAL
Permit #:20082761 Expiration Date:6/17/2009
Proposed Top PZ Location:Sec: Twp: Footage: 300 FNL  660 FEL
Bottom Hole Location:Sec:2 Twp: 7S 92W Footage: 300 FNL  660 FEL
Proposed Depth/Form:6275 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/31/2008
Spud Date:7/22/2008Spud Date Is:ACTUAL
Measured TD:6540 ft.Measured PB depth:6312 ft.
True Vertical TD:6209 ft.True Vertical PB depth:5981 ft.
Top PZ Location:Sec:2 Twp: 7S 92WFootage: 325 FNL  636 FEL
Bottom Hole Location:Sec:2 Twp: 7S 92WFootage: 325 FNL  636 FEL
Log Types:RST, CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1160 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 553, Top: 0 ft., Bottom: 1169 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6527 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1059, Top: 2430 ft., Bottom: 6540 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.3603 ft.NN
WILLIAMS FORK3604 ft.6540 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 12/1/2017                 Interval Top: 4712 ft.    Interval Bottom: 5993 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:10/2/2008Choke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/29/2008
Treatment Summary:STAGES 01 - 05 TREATED WITH A TOTAL OF 30,842 BBLS SLICKWATER & 398,924# 20/40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:5478 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/19/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 560
BBLS_OIL 5
BTU_GAS 1170
CALC_BBLS_H2O 560
CALC_BBLS_OIL 5
CALC_GOR 188800
CALC_MCF_GAS 944
CASING_PRESS 1350
GRAVITY_OIL 53
MCF_GAS 944
TUBING_PRESS 700
Perforation Data:
Interval Top:4712 ft.# Of Holes:135
Interval Bottom:5993 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)3815
GOR
GOR DeterminationMCFE
Average BOE per Day1.800
Average MCFE per Day10.452

 Federal Financial Assurance  i Y

 Tribal Well  i No