|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 6/1/2025 Measured TD: 10377 ft. Vertical TD: 10094 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 6/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/30/2010 | | Proposed Top PZ Location: | Sec:26 Twp: 7S 95W | Footage: 1909 FNL 1927 FWL | | Bottom Hole Location: | Sec:26 Twp: 7S 95W | Footage: 1909 FNL 1927 FWL | | Proposed Depth/Form: | 11046 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-53 , Unit Acreage: 640, Drill Unit: All | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: , Depth: 60 ft., Weight: line pipe, Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 3300 ft., Weight: 36# , Citings Type: PLANNED | | Cement: | Sacks: 1750, Top: 0 ft., Bottom: 3300 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 11046 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1165, Top: , Bottom: 11046 ft. | | Casing: | String Type: 3RD, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 11046 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 1165, Top: , Bottom: 11046 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/13/2010 | | Spud Date: | 3/29/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 10377 ft. | Measured PB depth: | 10250 ft. | | True Vertical TD: | 10094 ft. | True Vertical PB depth: | 9986 ft. | | Top PZ Location: | Sec:26 Twp: 7S 95W | Footage: 1909 FNL 2019 FWL | | Bottom Hole Location: | Sec:26 Twp: 7S 95W | Footage: 1944 FNL 1986 FWL | | Log Types: | CBL/RMTE | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 188 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 188 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3321 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1301, Top: 0 ft., Bottom: 3321 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10366 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1035, Top: 5720 ft., Bottom: 10366 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 7286 ft. | | | | | CAMEO | 9928 ft. | | | | | ROLLINS | 10216 ft. | | | |
Formation WFCM Formation Classification: GW Status: SI - 6/1/2025 Interval Top: 8393 ft. Interval Bottom: 10126 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 2/1/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/19/2011 | | Treatment Summary: | FRAC 6000 GAL OF 7.5% HCL; 697,133 GAL OF 2% KCL; 6034 SKS OF OTTAWA PROPPANT; 1690 SKS OF PRIME PLUS. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9960 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/3/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 211 | | BTU_GAS | 921 | | CALC_BBLS_H2O | 211 | | CALC_MCF_GAS | 556 | | CASING_PRESS | 1580 | | MCF_GAS | 556 | | TUBING_PRESS | 1160 |
| | Perforation Data: | | Interval Top: | 8393 ft. | # Of Holes: | 190 | | Interval Bottom: | 10126 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 31 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.013 |
| Average MCFE per Day | 0.083 |
| Federal Financial Assurance | i | Y |
|
|