Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16082
Well Classification: GW Status: PR - 7/1/2018
Well Name/No:BATTLEMENT MESA #26-14A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2018
FacilityID:296603LocationID:334415
County:GARFIELD #045Location:NWSW 26 7S95W 6
Field:PARACHUTE - #67350Elevation:8990 ft.
Basin:PICEANCE BASIN  
Planned Location:1775FSL  1092 FWLLat/Long: 39.405750 / -107.970180Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.405750 / -107.970188Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2018             Measured TD: 10030 ft.    Vertical TD: 10002 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2018
Wellbore PermitDIRECTIONAL
Permit #:20081282 Expiration Date:6/17/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1358 FSL  619 FWL
Bottom Hole Location:Sec:26 Twp: 7S 95W Footage: 1358 FSL  619 FWL
Proposed Depth/Form:10676 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-53 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:4/9/2009
Spud Date:3/30/2009Spud Date Is:ACTUAL
Measured TD:10030 ft.Measured PB depth:
True Vertical TD:10002 ft.True Vertical PB depth:
Top PZ Location:Sec:26 Twp: 7S 95WFootage: 1401 FSL  646 FWL
Bottom Hole Location:Sec:26 Twp: 7S 95WFootage: 1401 FSL  646 FWL
Log Types:CBL, RMTE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 200 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 2000 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3271 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1358, Top: 0 ft., Bottom: 3271 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10014 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1098, Top: 4470 ft., Bottom: 10014 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6970 ft.NN
CAMEO9325 ft.NN
ROLLINS9857 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/1/2018                  Interval Top: 8124 ft.    Interval Bottom: 9752 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/26/2009Choke Size:0.500 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/18/2009
Treatment Summary:FRAC 5952 GAL 7.5% HCL; 569478 GAL 2% KCL; 5841 SKS OTTAWA PROPPANT; 1477 SKS SB EXCEL.
Tubing Size:2.375 in.Tubing Setting Depth:9553 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/27/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 457
BTU_GAS 931
CALC_BBLS_H2O 457
CALC_MCF_GAS 1036
CASING_PRESS 1790
MCF_GAS 1036
TUBING_PRESS 1175
Perforation Data:
Interval Top:8124 ft.# Of Holes:172
Interval Bottom:9752 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1
Total Gas Produced (MCF)20472
GOR20472000
GOR DeterminationMCFE
Average BOE per Day9.654
Average MCFE per Day56.004

 Federal Financial Assurance  i Y

 Tribal Well  i No