Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-16053
Well Classification: GW Status: PR - 10/30/2008
Well Name/No:JUNIPER #11-1A (M1E)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/30/2008
FacilityID:296484LocationID:334666
County:GARFIELD #045Location:SWSW 1 7S92W 6
Field:MAMM CREEK - #52500Elevation:6126 ft.
Basin:PICEANCE BASIN  
Planned Location:1247FSL  321 FWLLat/Long: 39.472306 / -107.623314Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.472300 / -107.623310Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/30/2008             Measured TD: 5966 ft.    Vertical TD: 5602 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/30/2008
Wellbore PermitDIRECTIONAL
Permit #:20082763 Expiration Date:6/15/2009
Proposed Top PZ Location:Sec: Twp: Footage: 5 FNL  660 FEL
Bottom Hole Location:Sec:11 Twp: 7S 92W Footage: 5 FNL  660 FEL
Proposed Depth/Form:5655 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/9/2008
Spud Date:6/30/2008Spud Date Is:ACTUAL
Measured TD:5966 ft.Measured PB depth:5885 ft.
True Vertical TD:5602 ft.True Vertical PB depth:5521 ft.
Top PZ Location:Sec:11 Twp: 7S 92WFootage: 33 FNL  667 FEL
Bottom Hole Location:Sec:11 Twp: 7S 92WFootage: 33 FNL  667 FEL
Log Types:CBL-RST
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1108 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1117 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5946 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1062, Top: 1970 ft., Bottom: 5946 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.3433 ft.NN
WILLIAMS FORK3434 ft.4541 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 10/30/2008                Interval Top: 4692 ft.    Interval Bottom: 5647 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:10/2/2008Choke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/29/2008
Treatment Summary:STAGES 01 - 05 TREATED WITH A TOTAL OF 31,888 BBLS SLICKWATER & 386,141# 20/40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:5312 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/30/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 240
BBLS_OIL 10
BTU_GAS 1170
CALC_BBLS_H2O 240
CALC_BBLS_OIL 10
CALC_GOR 130000
CALC_MCF_GAS 1300
CASING_PRESS 1350
GRAVITY_OIL 53
MCF_GAS 1300
TUBING_PRESS 900
Perforation Data:
Interval Top:4692 ft.# Of Holes:135
Interval Bottom:5647 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)120
Total Gas Produced (MCF)17661
GOR147175
GOR DeterminationMCFE
Average BOE per Day8.671
Average MCFE per Day50.311

 Federal Financial Assurance  i 

 Tribal Well  i No