Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15988
Well Classification: GW Status: PR - 3/21/2009
Well Name/No:DIAMOND ELK #PA 12-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC05173
Facility Status:PRStatus Date3/21/2009
FacilityID:296308LocationID:334712
County:GARFIELD #045Location:NWNW 12 7S95W 6
Field:PARACHUTE - #67350Elevation:6154 ft.
Planned Location:1031FNL  1141 FWLLat/Long: 39.456898 / -107.952205Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.456882 / -107.952182Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/21/2009             Measured TD: 8000 ft.    Vertical TD: 7903 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/21/2009
Wellbore PermitDIRECTIONAL
Permit #:20082296 Expiration Date:6/3/2009
Prop Depth/Form:7947 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:10/5/2008
Spud Date:9/23/2008Spud Date Is:ACTUAL
Measured TD:8000 ft.Measured PB depth:7900 ft.
True Vertical TD:7903 ft.True Vertical PB depth:7803 ft.
Top PZ Location:Sec:12 Twp: 7S 95WFootage: 1521 FNL  348 FWLDepth
Bottom Hole Location:Sec:12 Twp: 7S 95WFootage: 1521 FNL  348 FWLDepth
Log Types:CBL; HRI/SD/DSN; MUD; RMTE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1128 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 0 ft., Bottom: 1128 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7980 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 966, Top: 3390 ft., Bottom: 7980 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2223 ft.NN
MESAVERDE4473 ft.NN
CAMEO6840 ft.NN
ROLLINS7760 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/21/2009                 Interval Top: 6081 ft.    Interval Bottom: 7710 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/10/2008Choke Size:0.156 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/9/2008
Treatment Summary:3585 GALS 7 1/2% HCL; 1044400# 30/50 SAND; 36375 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7296 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/21/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 968
CASING_PRESS 1370
MCF_GAS 766
TUBING_PRESS 953
Perforation Data:
Interval Top:6081 ft.# Of Holes:119
Interval Bottom:7710 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2023 - September 2024i
Total Oil Produced (Barrels)31
Total Gas Produced (MCF)18336
GOR591483
GOR DeterminationMCFE
Average BOE per Day8.724
Average MCFE per Day50.588

 Federal Financial Assurance  i Y

 Tribal Well  i No