Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15985
Well Classification: GW Status: PR - 1/18/2009
Well Name/No:DIAMOND ELK #PA 412-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC05173
Facility Status:PRStatus Date1/18/2009
FacilityID:296305LocationID:334712
County:GARFIELD #045Location:NWNW 12 7S95W 6
Field:PARACHUTE - #67350Elevation:6154 ft.
Planned Location:1045FNL  1142 FWLLat/Long: 39.456857 / -107.952201Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.456840 / -107.952178Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/18/2009             Measured TD: 8015 ft.    Vertical TD: 7794 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/18/2009
Wellbore PermitDIRECTIONAL
Permit #:20082294 Expiration Date:6/3/2009
Prop Depth/Form:8032 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:9/11/2008
Spud Date:8/29/2008Spud Date Is:ACTUAL
Measured TD:8015 ft.Measured PB depth:7959 ft.
True Vertical TD:7794 ft.True Vertical PB depth:7738 ft.
Top PZ Location:Sec:12 Twp: 7S 95WFootage: 2380 FNL  530 FWLDepth
Bottom Hole Location:Sec:12 Twp: 7S 95WFootage: 2380 FNL  530 FWLDepth
Log Types:CBL;HIGH RES IND.,SPCTRL DENS.,DUAL SPACED NEUTRON, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2523 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 636, Top: 0 ft., Bottom: 2523 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7995 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 948, Top: 3730 ft., Bottom: 7995 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2218 ft.NN
MESAVERDE4514 ft.NN
CAMEO6910 ft.NN
ROLLINS7865 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/18/2009                 Interval Top: 5862 ft.    Interval Bottom: 7799 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/24/2008Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/23/2008
Treatment Summary:3620 GALS 7.5% HCL; 879,300# 30/50 SAND; 24,024 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7372 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/18/2009Test Method:FLOWING
Hours Tested:19Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CASING_PRESS 1531
MCF_GAS 1017
TUBING_PRESS 1303
Perforation Data:
Interval Top:5862 ft.# Of Holes:134
Interval Bottom:7799 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2023 - September 2024i
Total Oil Produced (Barrels)31
Total Gas Produced (MCF)17757
GOR572806
GOR DeterminationMCFE
Average BOE per Day8.452
Average MCFE per Day49.001

 Federal Financial Assurance  i Y

 Tribal Well  i No