Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15900
Well Classification: GW Status: PR - 5/15/2008
Well Name/No:FEDERAL #RWF 333-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date5/15/2008
FacilityID:296049LocationID:335569
County:GARFIELD #045Location:NENW 18 6S94W 6
Field:RULISON - #75400Elevation:6157 ft.
Basin:PICEANCE BASIN  
Planned Location:1119FNL  1001 FWLLat/Long: 39.528981 / -107.934689Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.528982 / -107.934696Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/17/2008             Measured TD: 9635 ft.    Vertical TD: 8783 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/17/2008
Wellbore PermitDIRECTIONAL
Permit #:20081818 Expiration Date:5/14/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1542 FSL  2174 FEL
Bottom Hole Location:Sec:7 Twp: 6S 94W Footage: 1542 FSL  2174 FEL
Proposed Depth/Form:9779 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/23/2008
Spud Date:12/5/2008Spud Date Is:ACTUAL
Measured TD:9635 ft.Measured PB depth:9586 ft.
True Vertical TD:8783 ft.True Vertical PB depth:8734 ft.
Top PZ Location:Sec:7 Twp: 6S 94WFootage: 1561 FSL  2144 FEL
Bottom Hole Location:Sec:7 Twp: 6S 94WFootage: 1561 FSL  2144 FEL
Log Types:CBL, RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3450 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 3450 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9606 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1069, Top: 6076 ft., Bottom: 9606 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3367 ft.NN
MESAVERDE6092 ft.NN
CAMEO8791 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/31/2009                 Interval Top: 7453 ft.    Interval Bottom: 9415 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/3/2009Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/29/2009
Treatment Summary:3013 GALS 7.5% HCL; 850,900# 20/40 SAND; 23,912 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:9002 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/31/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1087
CASING_PRESS 2087
MCF_GAS 1431
TUBING_PRESS 1895
Perforation Data:
Interval Top:7453 ft.# Of Holes:128
Interval Bottom:9415 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)193
Total Gas Produced (MCF)34913
GOR180896
GOR DeterminationMCFE
Average BOE per Day17.058
Average MCFE per Day98.927

 Federal Financial Assurance  i Y

 Tribal Well  i No