Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15851
Well Classification: GW Status: PR - 5/9/2008
Well Name/No:FEDERAL #PA 431-31
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62162
Facility Status:PRStatus Date5/9/2008
FacilityID:295952LocationID:335491
County:GARFIELD #045Location:NENE 31 6S95W 6
Field:PARACHUTE - #67350Elevation:5517 ft.
Basin:PICEANCE BASIN  
Planned Location:735FNL  905 FELLat/Long: 39.486106 / -108.034293Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.486108 / -108.034293Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/3/2008             Measured TD: 7242 ft.    Vertical TD: 7098 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/3/2008
Wellbore PermitDIRECTIONAL
Permit #:20081469 Expiration Date:5/7/2009
Proposed Top PZ Location:Sec: Twp: Footage: 802 FNL  2013 FEL
Bottom Hole Location:Sec:31 Twp: 6S 95W Footage: 739 FNL  2036 FEL
Proposed Depth/Form:7262 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:11/20/2008
Spud Date:11/11/2008Spud Date Is:ACTUAL
Measured TD:7242 ft.Measured PB depth:7169 ft.
True Vertical TD:7098 ft.True Vertical PB depth:7025 ft.
Top PZ Location:Sec:31 Twp: 6S 95WFootage: 701 FNL  2038 FEL
Bottom Hole Location:Sec:31 Twp: 6S 95WFootage: 701 FNL  2038 FEL
Log Types:CBL, HIGH RES. IND., SPECTRAL DENSITY, DUAL SPACED NEUTRON, RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 34 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 796 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 262, Top: 0 ft., Bottom: 796 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7210 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 843, Top: 2400 ft., Bottom: 7210 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1525 ft.NN
MESAVERDE3949 ft.NN
CAMEO6544 ft.NN
ROLLINS7115 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/19/2009                 Interval Top: 5258 ft.    Interval Bottom: 7016 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/18/2009Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/14/2009
Treatment Summary:2982 GALS 7.5% HCL; 808,900# 20/40 SAND; 23140 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6813 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/19/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1087
CALC_BBLS_OIL 0
CASING_PRESS 1223
MCF_GAS 1267
TUBING_PRESS 1101
Perforation Data:
Interval Top:5258 ft.# Of Holes:118
Interval Bottom:7016 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)13270
GOR698421
GOR DeterminationMCFE
Average BOE per Day6.320
Average MCFE per Day36.665

 Federal Financial Assurance  i Y

 Tribal Well  i No