Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15845
Well Classification: GW Status: PR - 4/16/2011
Well Name/No:FEDERAL #PA 343-30
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62162
Facility Status:PRStatus Date4/16/2011
FacilityID:295942LocationID:335491
County:GARFIELD #045Location:NENE 31 6S95W 6
Field:PARACHUTE - #67350Elevation:5517 ft.
Basin:PICEANCE BASIN  
Planned Location:739FNL  867 FELLat/Long: 39.486093 / -108.034156Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.486090 / -108.034155Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/16/2011             Measured TD: 7950 ft.    Vertical TD: 7227 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/16/2011
Wellbore PermitDIRECTIONAL
Permit #:20090554 Expiration Date:4/13/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1880 FSL  817 FEL
Bottom Hole Location:Sec:30 Twp: 67S 95W Footage: 1880 FSL  817 FEL
Proposed Depth/Form:8010 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/6/2009
Spud Date:3/28/2009Spud Date Is:ACTUAL
Measured TD:7950 ft.Measured PB depth:7903 ft.
True Vertical TD:7227 ft.True Vertical PB depth:7180 ft.
Top PZ Location:Sec:30 Twp: 6S 95WFootage: 1862 FNL  823 FEL
Bottom Hole Location:Sec:30 Twp: 6S 95WFootage: 1862 FNL  836 FEL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE, MUD
Log Types:CBL, RESEVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 56 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 56 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2390 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 524, Top: 0 ft., Bottom: 2390 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7934 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 871, Top: 3410 ft., Bottom: 7934 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND1903 ft.
WASATCH G1903 ft.NN
MESAVERDE4457 ft.
CAMEO7225 ft.
ROLLINS7791 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/30/2010                Interval Top: 5849 ft.    Interval Bottom: 7687 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/7/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/5/2010
Treatment Summary:4533 GALS 7 1/2% HCL; 959000# 30/50 SAND; 27060 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:7359 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1086
CALC_MCF_GAS 1090
CASING_PRESS 688
MCF_GAS 1090
TUBING_PRESS 419
Perforation Data:
Interval Top:5849 ft.# Of Holes:138
Interval Bottom:7687 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)14813
GOR548629
GOR DeterminationMCFE
Average BOE per Day7.075
Average MCFE per Day41.034

 Federal Financial Assurance  i Y

 Tribal Well  i No